KRL | Fabricant de batteries au lithium et de systèmes de stockage d'énergie (BESS) sur mesure

Télécharger le PDF des caractéristiques techniques

Sommaire

Gamme de systèmes de stockage d’énergie (ESS) C&I à refroidissement liquide pour installation en extérieur : 125 kW / 261 kWh, 250 kW / 522 kWh ou de l’ordre du MW

People buy kilowatt-hours. Sites trip on kilowatts.

A manager remembers "261 kWh" because the number is tidy. Then three process motors, a compressor and a dryer start together. The converter that looked fine on the quote drops out. The line still stops.

That is why KRL Power publishes three outdoor liquid-cooled classes. One cabinet size does not cover every yard.

Tableau de sélection des modèles KRL-B261L, KRL-B522L et KRL-B2M6L
Buy thisWhen the site looks like this
KRL-B261L 125 kW / 261 kWhOne feeder stays inside 125 kW after motors start
KRL-B522L 250 kW / 522 kWhSeveral loads hit the 250 kW class at once
KRL-B2M6L, classe 1-2 MW / 2-6 MWhSeveral feeders or plant-scale energy
ClassPuissance / énergieParallelPuissance photovoltaïque maximaleDieselCommutation
B261L125 kW / 261 kWh10120 kWOuiunder 10 ms
B522L250 kW / 522 kWh6240 kWOuiunder 10 ms
B2M6L750 kW / 1.5 MWh or 1000 kW / 2 MWhproject design720 kW or 960 kWOuiunder 10 ms

Keep that second table. It is the whole argument in six rows.

Power, then energy, then the ports

I size in this order.

Power that must stay up when the grid dies or the tariff spike hits. How long that signed load must run after usable-energy deductions. Whether solar and diesel have to land on the same cabinet.

Flip the order and the quote looks cheap. Handover gets expensive.

B261L, B522L and B2M6L all list battery liquid cooling, a diesel port, and on/off-grid switching under 10 ms. Shared lines do not pick the cabinet. 125 kW, 250 kW or 750 kW / 1000 kW does. So does the PV rating glued to each class.

2.1 hours is arithmetic

261 / 125 is about 2.1 hours.

522 / 250 is about 2.09 hours.

1.5 MWh / 750 kW is 2 hours. 2 MWh / 1000 kW is 2 hours.

Published energy divided by published power. Usable time is shorter.

Four cuts come off the nameplate before anyone should promise hours:

KRL does not publish one usable-energy percentage for every site. This page will not invent one. Hours belong in the configuration, measured at the agreed meter point.

A 90 kW running log is the next trap. Steady load is a different number from starting current. Direct-on-line motors bite harder than a soft starter or a VFD. Three machines starting together can take a 125 kW converter off the board even when the lunch-time trace looked comfortable.

Same warning at 250 kW. Same warning at 750 kW and 1000 kW.

All three product pages cap altitude under 2000 m. Higher than that, ask for derating in writing.

Walk the feeder first

Three site shapes keep coming back. They are not project case studies. They are the questions a measured feeder usually produces.

One process line, 80-110 kW running, motors staggered. B261L is the first screen. Confirm start method. If two dryers can still bump together, finish that review before locking 125 kW.

Two lines plus compressors, 140-180 kW when they overlap. B261L power is already short. B522L is the first screen. Energy may still look like "one 261." The converter is the constraint.

Whole hall, 400 kW and up, or several hours of hold. Stop forcing yard cabinets. Open B2M6L and name the exact model. Parallel B261L or B522L stays inside published counts. Civil work and EMS are a different job from one plant package.

If the protected list keeps growing in the meeting, class is still open. Sign one feeder first.

What actually differs on the three sheets

Liquid cooling is on B261L, B522L and B2M6L. PCS cooling is listed as intelligent cooling. Only B261L publishes cell temperature difference within 3 °C. Leave that sentence on the B261L page.

Shared published window on all three product pages:

Under 10 ms comes from the PCS and the changeover path. Coolant does not create it. A diesel set still needs seconds. In those seconds the signed load either rides on the battery or it drops.

Solar input is the split people skip.

ClassPuissance photovoltaïque maximaleMPPTNotes from the product page
B261L120 kW1 or 4 channels950 Vdc max, 250-850 Vdc MPPT, 200 A
B522L240 kW2 channels200 A + 200 A
B2M6L720 kW or 960 kW6 or 8 channelsMatch the exact model string

Diesel port: yes on all three.

Then weight. This is where a cheap quote becomes an expensive crane.

ClassSizeMesse
B261L980 x 1300 x 2320 mmenviron 2 600 kg
B522L2480 x 1400 x 2050 mmenviron 4 900 kg
B2M6L pair6058 x 2438 x 2896 mmabout 15 t or 19.5 t

A pad poured for 2.6 t will not hold 19.5 t. That shows up on the crane invoice.

When to stay on KRL-B261L 125 kW or move to KRL-B522L 250 kW

Two B261L cabinets are not a B522L

This shortcut keeps turning up in shopping lists.

B522L is 250 kW / 522 kWh. Two B261L cabinets add to 250 kW / 522 kWh on paper. The sheets still diverge.

Two B261L cabinets fit a site that grows as two feeders. One B522L fits one feeder that already needs 250 kW. Price them as different machines.

Project language for the 250 kW cabinet also sits on the KRL 522 kWh / 250 kW solar-storage-diesel cabinet page.

B261L: one feeder, 125 kW, solar and diesel already on the box

Use B261L when the protected feeder stays inside 125 kW after the start review, and the signed outage still fits 261 kWh after reserve.

Published sheet:

PV and diesel are already on this cabinet. A second vendor does not need to invent those ports later.

Night-shift plants often like this class because the signed list is short: PLC, selected motors, lighting, one compressor. The usual miss is adding the whole hall after the cabinet is already on the truck.

B522L: the 125 kW box ran out

Move here when several loads need 250 kW at the same moment, or 261 kWh cannot cover the outage.

Published sheet:

Charging yards often land here for a different reason than factories. Two DC chargers plus site house load can sit above 125 kW even when daily energy still looks modest. Power class first. Energy second.

B2M6L: a yard cabinet is the wrong first drawing for a plant

Two published models:

The collection title says 1-2 MW / 2-6 MWh. Orders should use the exact model string.

Maximum AC current is 1130 A or 1500 A. Switching stays under 10 ms. Diesel port stays on the sheet. Battery cooling stays liquid.

This class belongs on multi-feeder plants, long hold times, or a yard already drawn around a 20 ft footprint. A 980 mm-wide outdoor cabinet pad will not carry that current or that mass.

What the cabinet should do tomorrow morning

Grid to EMS to the KRL cabinet that was actually bought to the feeder that was signed.

Diesel covers the long night. Solar uses the PV rating of that class.

What is happeningWhat the cabinet should do
Grid on, sun upPV feeds the process and charges the battery, up to 120 / 240 / 720 / 960 kW
Grid on, tariff uglyHold the signed feeder. Clip the import spike inside PCS rating
Grid goneSwitch under 10 ms. Keep the signed feeder alive
Outage longer than usable energyStart diesel through the published port

Cost context without a made-up LCOE: Guide des coûts du stockage d'énergie à usage commercial.

If the safety review wants another cell type: KRL solid-state battery technology, then back to the matching cabinet page.

Five misses that look cheap on day one

Buying kWh and ignoring kW. 261 kWh does not start three motors.

Treating nameplate hours as delivered hours. 2.1 hours is arithmetic. Write usable AC kWh at the meter.

Copying B261L's 3 °C line onto B522L or B2M6L. That sentence lives on the B261L page.

Pouring one pad for every class. 2600 kg, 4900 kg, 15 t, 19.5 t.

Leaving PV and diesel as "later." The ports are already on the published sheets. If the roof or the generator is real, size the class against those ratings now.

Before money moves

One cabinet carries the battery, liquid cooling, PCS and EMS.

Certificates on the public site: UL / CE / IEC / UN38.3. FORM E is listed. Files should follow the serial number.

Handover can use published numbers. Under 10 ms is on all three pages. The 3 °C map is on B261L.

Missing from the public tables: Taux C versus ambient, coolant type, leak trip, isolation valves. Those belong in the project file.

Cost of choosing the wrong KRL C&I ESS class

If the wrong class lands on the pad

SiteClassWhat the miss costs
One feeder inside 125 kWB261LExtra steel and extra CAPEX if the project jumps to B522L or B2M6L
Demand sits in the 250 kW classB522LThe converter runs short if the project stays on B261L
Several feeders in one yardParallel B261L to 10 or B522L to 6Board and EMS work later
750 kW / 1000 kW plantExact B2M6L modelWrong pad, crane and current

Send this. Then ask for a configuration.

KRL Power contact channel. One class. Usable energy at the agreed window. Handover list.

FAQ

Within 3 °C on the B261L page only.
Under 10 ms on all three. PCS function.
120 kW, 240 kW, then 720 kW or 960 kW.
B261L up to 10. B522L up to 6. B2M6L follows project design.
-10 °C to 55 °C on B261L, B522L and B2M6L.
About 2600 kg, 4900 kg, then 15 t or 19.5 t.
KRL-B261L 125 kW / 261 kWh when the feeder stays inside 125 kW after motor-start review.
Under 10 ms on B261L, B522L and B2M6L.
Match the protected feeder and usable energy. 125 kW / 261 kWh versus 250 kW / 522 kWh.

Envoyez votre demande dès aujourd'hui

Obtenez votre solution énergétique sur mesure en 24 heures

Ne payez plus les marges des marques. Collaborez directement avec une usine qui existe depuis 20 ans.

KRL Power — Le moteur des projets énergétiques mondiaux

Reconnu dans le monde entier :

UL, CE, CEI, UN 38.3

Mannequins sexy :

B65 · B100 · B241 · B26LL · B61LL · B522L · B2M6L

Applications :

Usines · Parcs solaires · Exploitations minières · Îles · Centres de données

Parlez-nous de votre projet : nous concevrons le système sur mesure pour vous.