{"id":12929,"date":"2026-09-30T10:00:54","date_gmt":"2026-09-30T10:00:54","guid":{"rendered":"https:\/\/www.krlpower.com\/?p=12929"},"modified":"2026-09-30T10:00:59","modified_gmt":"2026-09-30T10:00:59","slug":"italy-factory-battery-storage-1044kwh","status":"publish","type":"post","link":"https:\/\/www.krlpower.com\/xh\/bess\/italy-factory-battery-storage-1044kwh\/","title":{"rendered":"Italy Factory Battery Storage: Four KRL 261 kWh Units with One Grid-Connection Cabinet"},"content":{"rendered":"<div data-elementor-type=\"wp-post\" data-elementor-id=\"12929\" class=\"elementor elementor-12929\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-8887f40 auto-article-root e-flex e-con-boxed e-con e-parent\" data-id=\"8887f40\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-2911a0da auto-p elementor-widget elementor-widget-heading\" data-id=\"2911a0da\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">A factory can purchase approximately 1 MWh of batteries and still receive the wrong converter arrangement. This Italian enquiry illustrates the risk: the customer requested a complete 200 kW PCS \/ 1 MWh LFP system, while the proposed modular configuration uses four 125 kW \/ 261 kWh KRL cabinets. Those are not the same power specification.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-224b87d9 auto-p elementor-widget elementor-widget-heading\" data-id=\"224b87d9\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">The decision is whether the customer accepts additional installed converter capacity under a verified site-level power limit&#x2014;not whether the quotation can relabel 500 kW as 200 kW.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-b02f1cf0 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"b02f1cf0\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Quick Answer: Four Cabinets Provide 1.044 MWh, Not a 200 kW PCS<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-5c6b390b auto-p elementor-widget elementor-widget-heading\" data-id=\"5c6b390b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">The preliminary recommendation is four KRL-B261L all-in-one units plus one 400 V parallel\/grid-connection cabinet. Their arithmetic totals are 1,044 kWh nominal battery energy and 500 kW installed PCS power. If the customer requires 200 kW operation, propose an aggregate EMS limit subject to KRL validation, distributor acceptance and written customer approval.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-f6af5d0e auto-p elementor-widget elementor-widget-heading\" data-id=\"f6af5d0e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Keep the existing 220 kWp PV array and two 100 kW Growatt inverters AC-coupled. Connect storage behind the factory's existing MV\/LV transformer, assuming its secondary is confirmed as 400 V. The 20 kV Areti connection is not the storage cabinet terminal voltage. Final selection requires the load profile, approved single-line diagram, transformer data and clarification of the reported 155.8 kW import figure.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-06be3765 auto-image elementor-widget elementor-widget-image\" data-id=\"06be3765\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/09\/italy-factory-pv-storage-brief-1-1024x576.png\" class=\"attachment-large size-large wp-image-12925\" alt=\"italy-factory-pv-storage-brief-1\" srcset=\"https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/09\/italy-factory-pv-storage-brief-1-1024x576.png 1024w, https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/09\/italy-factory-pv-storage-brief-1-300x169.png 300w, https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/09\/italy-factory-pv-storage-brief-1-768x432.png 768w, https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/09\/italy-factory-pv-storage-brief-1-1536x864.png 1536w, https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/09\/italy-factory-pv-storage-brief-1-18x10.png 18w, https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/09\/italy-factory-pv-storage-brief-1-600x338.png 600w, https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/09\/italy-factory-pv-storage-brief-1.png 1600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\"\/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-208be391 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"208be391\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">What the Customer Has&#x2014;and What Still Needs Confirmation<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-e7a69d2e auto-table elementor-widget elementor-widget-text-editor\" data-id=\"e7a69d2e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<div class=\"cea-table-wrap\"><table><thead><tr><th>Ulwazi lomthengi<\/th><th>Engineering interpretation<\/th><th>Required confirmation<\/th><\/tr><\/thead><tbody><tr><td>Factory operates 07:00&#x2013;17:00<\/td><td>Daytime PV and production overlap<\/td><td>Interval load and PV records, including weekends<\/td><\/tr><tr><td>220 kWp PV; also described as 200 kW panels<\/td><td>Use 220 kWp as the preliminary DC array figure<\/td><td>Module schedule and approved as-built documents<\/td><\/tr><tr><td>Two 100 kW Growatt inverters<\/td><td>Approximately 200 kW existing nominal PV AC conversion<\/td><td>Exact models, settings and communications<\/td><\/tr><tr><td>Areti connection at 20 kV<\/td><td>MV-connected site with internal LV distribution<\/td><td>Transformer secondary voltage and connection agreement<\/td><\/tr><tr><td>Maximum grid import 155.8 kW<\/td><td>May be historical demand or a binding limit<\/td><td>Original bill, measurement period or contractual wording<\/td><\/tr><tr><td>Contracted\/available power 400.32 kW<\/td><td>Commercial connection figure, not transformer capacity<\/td><td>Import\/export limits and applicable tariff<\/td><\/tr><tr><td>Requested 200 kW PCS \/ 1 MWh LFP<\/td><td>Energy target aligns with four 261 kWh units<\/td><td>Acceptance of 500 kW installed PCS with restricted dispatch<\/td><\/tr><\/tbody><\/table><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-9ec4e353 auto-p elementor-widget elementor-widget-heading\" data-id=\"9ec4e353\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">This is a configuration proposal, not evidence of a commissioned Italian project. KRL defines the storage package and control interfaces; the local EPC and authorized electrical designer verify site works, protection, permitting and the Areti submission.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-9b9f7782 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"9b9f7782\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Separate Peak-Shaving Power from Stored Energy<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-1bf2707b auto-p elementor-widget elementor-widget-heading\" data-id=\"1bf2707b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Peak shaving starts with the factory's net demand: factory load minus available PV. Battery discharge supplies only the portion above the agreed import target, within converter, SOC, temperature and protection limits. If 155.8 kW is simply a previously recorded maximum, it should not automatically become the control setpoint.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-6d9d9ba9 auto-p elementor-widget elementor-widget-heading\" data-id=\"6d9d9ba9\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">The required energy is the accumulated power deficit over the target period. For example, a hypothetical 100 kW reduction sustained for three hours requires 300 kWh delivered at the agreed AC measurement boundary. That example is not a measured duty for this factory.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c8dd9bc5 auto-p elementor-widget elementor-widget-heading\" data-id=\"c8dd9bc5\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">The proposed battery total is:<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-3b363f39 auto-p elementor-widget elementor-widget-heading\" data-id=\"3b363f39\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\"><strong>4 &#xD7; 261 kWh = 1,044 kWh nominal energy.<\/strong><\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-1bca6f88 auto-p elementor-widget elementor-widget-heading\" data-id=\"1bca6f88\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">At 200 kW, its nominal energy-to-power ratio is 5.22 hours; at 500 kW, it is 2.09 hours. Neither figure is a guaranteed discharge duration. The permitted SOC window, conversion losses, auxiliaries, reserve and aging reduce deliverable energy. The quotation must define usable AC energy and its test boundary separately.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-8cbabd1d auto-p elementor-widget elementor-widget-heading\" data-id=\"8cbabd1d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">A ten-hour production day does not imply ten hours of full battery discharge. Conversely, 1.044 MWh cannot automatically support the entire factory for ten hours. Interval data determines whether this energy class is appropriate or oversized for the actual peak-shaving opportunity.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-b799816d auto-h2 elementor-widget elementor-widget-heading\" data-id=\"b799816d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Recommended Architecture: Preserve Existing PV on the AC Bus<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-f52f3185 auto-p elementor-widget elementor-widget-heading\" data-id=\"f52f3185\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">The preliminary power path is Areti 20 kV &#x2192; existing MV switchgear and transformer &#x2192; factory LV bus. Four protected storage feeders connect through the new parallel\/grid-connection cabinet to that same LV bus. Existing Growatt PV and factory loads retain their own protected connections.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-586f4ef1 auto-p elementor-widget elementor-widget-heading\" data-id=\"586f4ef1\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">I- <a href=\"https:\/\/www.krlpower.com\/xh\/battery\/krl-b261l-125kw-261kwh\/\" style=\"color:#046bd2\">KRL-B261L product platform<\/a> integrates battery storage and bidirectional PCS, with PV MPPT and generator interfaces. For this retrofit, retain the existing PV conversion path. Integrated MPPT inputs remain unused unless a separately approved PV expansion or DC retrofit is designed; do not connect the same PV strings to both arrangements.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-85401985 auto-p elementor-widget elementor-widget-heading\" data-id=\"85401985\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Site-level control needs a verified measurement of total grid exchange at the actual PCC. An LV-side control meter may be practical, but its location and transformation\/loss treatment must match the approved design. A meter measuring only the storage feeder cannot regulate the whole factory's import or export.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c0ff9b9f auto-p elementor-widget elementor-widget-heading\" data-id=\"c0ff9b9f\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">The new cabinet is LV AC combining equipment, not a 20 kV cabinet. Select its busbars, short-circuit withstand, protection, isolation and communications for the project. MV protection and utility metering remain separate unless explicitly included.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-7305e93d auto-image elementor-widget elementor-widget-image\" data-id=\"7305e93d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/09\/italy-factory-four-b261l-single-line-2-1024x576.png\" class=\"attachment-large size-large wp-image-12926\" alt=\"italy-factory-four-b261l-single-line-2\" srcset=\"https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/09\/italy-factory-four-b261l-single-line-2-1024x576.png 1024w, https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/09\/italy-factory-four-b261l-single-line-2-300x169.png 300w, https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/09\/italy-factory-four-b261l-single-line-2-768x432.png 768w, https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/09\/italy-factory-four-b261l-single-line-2-1536x864.png 1536w, https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/09\/italy-factory-four-b261l-single-line-2-18x10.png 18w, https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/09\/italy-factory-four-b261l-single-line-2-600x338.png 600w, https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/09\/italy-factory-four-b261l-single-line-2.png 1600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\"\/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-029ac8d6 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"029ac8d6\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">KRL Configuration and Verified Product Boundaries<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-03f9a57f auto-table elementor-widget elementor-widget-text-editor\" data-id=\"03f9a57f\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<div class=\"cea-table-wrap\"><table><thead><tr><th>Into<\/th><th>Preliminary selection<\/th><th>Boundary<\/th><\/tr><\/thead><tbody><tr><td>Storage units<\/td><td>4 &#xD7; KRL-B261L, 125 kW \/ 261 kWh each<\/td><td>Complete all-in-one units, not bare battery enclosures<\/td><\/tr><tr><td>Ibhetri<\/td><td>1,044 kWh nominal, LiFePO4<\/td><td>Delivered energy separately specified<\/td><\/tr><tr><td>PCS<\/td><td>500 kW installed total<\/td><td>Proposed aggregate operating limit requires validation<\/td><\/tr><tr><td>AC terminals<\/td><td>400\/230 V, L1\/L2\/L3\/N\/PE<\/td><td>Confirm factory LV voltage and earthing<\/td><\/tr><tr><td>Maximum published AC current<\/td><td>189 A per unit<\/td><td>Feeder and cabinet selection needs full design review<\/td><\/tr><tr><td>Battery thermal control<\/td><td>Ukupholisa ngamanzi<\/td><td>Ambient conditions and derating assessed for the site<\/td><\/tr><tr><td>Isingxobo sebhetri<\/td><td>Ipasi yomgangatho we-IP65<\/td><td>Not a rating for the complete yard or LV cabinet<\/td><\/tr><tr><td>Published operating range<\/td><td>&#x2212;10&#xB0;C to 55&#xB0;C<\/td><td>Check project-specific operating\/derating conditions<\/td><\/tr><tr><td>PV interface<\/td><td>Up to 120 kW per unit<\/td><td>Unused in the proposed existing-PV AC retrofit<\/td><\/tr><tr><td>Published parallel quantity<\/td><td>Up to 10 units<\/td><td>Four-unit coordination still requires approval<\/td><\/tr><tr><td>Unit size \/ mass<\/td><td>980 &#xD7; 1,300 &#xD7; 2,320 mm; approximately 2,600 kg<\/td><td>Verify delivered revision, foundation and lifting plan<\/td><\/tr><tr><td>LV combining equipment<\/td><td>1 parallel\/grid-connection cabinet<\/td><td>Final BOM and protection functions project-defined<\/td><\/tr><tr><td>Supervisory control<\/td><td>Site EMS with PCC measurement<\/td><td>Coordinate four units, existing PV and grid limits<\/td><\/tr><\/tbody><\/table><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c4eb7c5a auto-p elementor-widget elementor-widget-heading\" data-id=\"c4eb7c5a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Four units weigh approximately 10.4 tonnes before other equipment. Verify foundations, lifting access, drainage, cable routes and service clearances against installation drawings. The <a href=\"https:\/\/www.krlpower.com\/xh\/iibhetri\/ci-energy-storage-system\/\" style=\"color:#046bd2\">C&amp;I storage selection hub<\/a> provides context for alternative package sizes.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a89f694a auto-image elementor-widget elementor-widget-image\" data-id=\"a89f694a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/09\/italy-factory-krl-b261l-product-configuration-3-1024x576.png\" class=\"attachment-large size-large wp-image-12927\" alt=\"italy-factory-krl-b261l-product-configuration-3\" srcset=\"https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/09\/italy-factory-krl-b261l-product-configuration-3-1024x576.png 1024w, https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/09\/italy-factory-krl-b261l-product-configuration-3-300x169.png 300w, https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/09\/italy-factory-krl-b261l-product-configuration-3-768x432.png 768w, https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/09\/italy-factory-krl-b261l-product-configuration-3-1536x864.png 1536w, https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/09\/italy-factory-krl-b261l-product-configuration-3-18x10.png 18w, https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/09\/italy-factory-krl-b261l-product-configuration-3-600x338.png 600w, https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/09\/italy-factory-krl-b261l-product-configuration-3.png 1600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\"\/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-88134c95 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"88134c95\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">EMS Operation for a 07:00&#x2013;17:00 Factory<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-fcaddb85 auto-p elementor-widget elementor-widget-heading\" data-id=\"fcaddb85\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Prioritize direct PV consumption by factory loads. When measured PV production exceeds demand, the EMS can request battery charging through the shared AC bus, subject to permitted charging power and SOC headroom. At high net demand, discharge offsets import above the agreed target.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-f94015f9 auto-p elementor-widget elementor-widget-heading\" data-id=\"f94015f9\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">If 200 kW is the accepted dispatch limit, enforce it across all four units&#x2014;not independently per unit. Charging and discharging limits should be documented separately. SOC-aware sharing avoids commanding an unavailable cabinet and records each unit's contribution.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-b1d1d968 auto-p elementor-widget elementor-widget-heading\" data-id=\"b1d1d968\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Export control is a separate constraint. Zero-export or export-limited operation must follow the approved connection terms; it is not created merely by writing &#x201C;self-consumption&#x201D; on the proposal. The EPC must verify control response, PV coordination, trip interfaces and the safe response to loss of PCC metering or communications.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-029ec657 auto-p elementor-widget elementor-widget-heading\" data-id=\"029ec657\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Night charging is optional, not automatic. It only makes commercial sense after checking tariff differences, losses, degradation and remaining import headroom. Do not schedule all available converters at full charge power against a potentially lower site limit.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c943f15b auto-image elementor-widget elementor-widget-image\" data-id=\"c943f15b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/09\/italy-factory-ems-control-boundaries-4-1024x576.png\" class=\"attachment-large size-large wp-image-12928\" alt=\"italy-factory-ems-control-boundaries-4\" srcset=\"https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/09\/italy-factory-ems-control-boundaries-4-1024x576.png 1024w, https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/09\/italy-factory-ems-control-boundaries-4-300x169.png 300w, https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/09\/italy-factory-ems-control-boundaries-4-768x432.png 768w, https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/09\/italy-factory-ems-control-boundaries-4-1536x864.png 1536w, https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/09\/italy-factory-ems-control-boundaries-4-18x10.png 18w, https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/09\/italy-factory-ems-control-boundaries-4-600x338.png 600w, https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/09\/italy-factory-ems-control-boundaries-4.png 1600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\"\/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d0212d5f auto-h2 elementor-widget elementor-widget-heading\" data-id=\"d0212d5f\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Italian Grid Review and Acceptance Before Release<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-e5667a33 auto-p elementor-widget elementor-widget-heading\" data-id=\"e5667a33\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Because the reported public-grid connection is MV, review the project against current CEI 0-16 requirements and Areti's connection process. Internal 400 V equipment does not turn the public connection into an LV application. CEI publishes the standard, amendments and controller annexes; Areti provides connection and modification procedures for existing sites.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-ff4685bc auto-p elementor-widget elementor-widget-heading\" data-id=\"ff4685bc\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Ask the local designer to assess interface protection, disconnection, metering, declared generating\/storage power, and whether CCI\/controller or communication obligations apply to the revised installation. Recent ARERA measures and subsequent changes make this a current-document check, not a blanket compliance statement. A software power limit alone does not prove how Areti will classify installed equipment.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-825a8111 auto-p elementor-widget elementor-widget-heading\" data-id=\"825a8111\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Before procurement, confirm the SLD, utility acceptance and scope split. Verify control sequences, protection and FAT records before shipment. SAT must test aggregate limits, PV charging, import\/export control, meter polarity, SOC boundaries and communication-failure behavior against agreed thresholds and conditions.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-7abfe0f6 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"7abfe0f6\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Information Needed for a Comparable Quotation<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-49780987 auto-p elementor-widget elementor-widget-heading\" data-id=\"49780987\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Provide load\/PV interval data, twelve months of bills, the Areti agreement, and clarification of 155.8 kW and 400.32 kW. Add transformer data, LV ratings, fault levels, earthing, cable distances and Growatt models.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-1c092b1b auto-p elementor-widget elementor-widget-heading\" data-id=\"1c092b1b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Confirm import\/export policy, charging\/discharging limits, reserve SOC and critical loads. Include site photos, ambient conditions, installation area, delivery location, schedule and ownership of civil works, MV equipment, permitting and commissioning.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-f95cbc74 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"f95cbc74\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Frequently Asked Questions<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-0d4f56af auto-h2 elementor-widget elementor-widget-heading\" data-id=\"0d4f56af\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Request a Four-Cabinet Interface Review<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-1f03d992 auto-p elementor-widget elementor-widget-heading\" data-id=\"1f03d992\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Send the SLD, transformer data, load\/PV records and original grid-limit documents to <a href=\"https:\/\/www.krlpower.com\/xh\/contact-us\/\" style=\"color:#046bd2\">KRL's engineering team<\/a>. Request a four-unit 1.044 MWh proposal with one LV parallel\/grid-connection cabinet, an explicitly declared PCS operating limit and a responsibility matrix for Italian interconnection. The next deliverable should be a reviewed configuration and scope&#x2014;not an unsupported savings promise.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-231436d1 elementor-align-center auto-cta elementor-widget elementor-widget-button\" data-id=\"231436d1\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"button.default\">\n\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm\" href=\"#elementor-action%3Aaction%3Dpopup%3Aopen%26settings%3DeyJpZCI6Ijc5MSIsInRvZ2dsZSI6ZmFsc2V9\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">Request a Four-Cabinet Interface Review<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-4ed798ad auto-h2 elementor-widget elementor-widget-heading\" data-id=\"4ed798ad\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Primary Sources and Related Engineering Reading<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a9a4db8e auto-p elementor-widget elementor-widget-heading\" data-id=\"a9a4db8e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Technical and regulatory references checked on 30 September 2026. Final projects require current revisions and site-specific approval.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-3b9daa45 auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"3b9daa45\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><a href=\"https:\/\/www.krlpower.com\/xh\/battery\/krl-b261l-125kw-261kwh\/\" style=\"color:#046bd2\">KRL-B261L official product specifications<\/a><\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><a href=\"https:\/\/www.krlpower.com\/xh\/bess\/two-b261l-vs-b522l-250kw-class\/\" style=\"color:#046bd2\">KRL: Two B261L cabinets versus one B522L<\/a><\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><a href=\"https:\/\/www.ceinorme.it\/en\/free-documents-and-faqs\/standards-cei-0-16-and-cei-0-21-tr-57-126-e-pas-57-127\/\" target=\"_blank\" rel=\"noopener\">CEI: CEI 0-16 and CEI 0-21 documents, amendments and annexes<\/a><\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><a href=\"https:\/\/www.areti.it\/servizi\/connessione-impianti-produzione\" target=\"_blank\" rel=\"noopener\">Areti: Connection of production plants and changes to existing sites<\/a><\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><a href=\"https:\/\/www.arera.it\/atti-e-provvedimenti\/dettaglio\/25\/385-25\" target=\"_blank\" rel=\"noopener\">ARERA Resolution 385\/2025\/R\/eel<\/a><\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><a href=\"https:\/\/www.arera.it\/en\/atti-e-provvedimenti\/dettaglio\/25\/564-25\" target=\"_blank\" rel=\"noopener\">ARERA Resolution 564\/2025\/R\/eel<\/a><\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>","protected":false},"excerpt":{"rendered":"<p>A preliminary Italian factory proposal uses four KRL 125 kW \/ 261 kWh all-in-one units and one LV parallel\/grid-connection cabinet. The design preserves existing Growatt PV and separates 500 kW installed PCS capacity from a proposed 200 kW operating limit.<\/p>","protected":false},"author":6,"featured_media":12925,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_uag_custom_page_level_css":"","site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"_joinchat":[],"footnotes":""},"categories":[77,95],"tags":[1076,1079,457,1078,1075,878,489,1077],"class_list":["post-12929","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-bess","category-energy-storage","tag-1-044-mwh-bess","tag-areti-grid-connection","tag-energy-management-system","tag-growatt-pv-integration","tag-italy-factory-battery-storage","tag-krl-b261l","tag-peak-shaving","tag-pv-self-consumption"],"acf":[],"uagb_featured_image_src":{"full":["https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/09\/italy-factory-pv-storage-brief-1.png",1600,900,false],"thumbnail":["https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/09\/italy-factory-pv-storage-brief-1-150x150.png",150,150,true],"medium":["https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/09\/italy-factory-pv-storage-brief-1-300x169.png",300,169,true],"medium_large":["https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/09\/italy-factory-pv-storage-brief-1-768x432.png",768,432,true],"large":["https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/09\/italy-factory-pv-storage-brief-1-1024x576.png",1024,576,true],"1536x1536":["https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/09\/italy-factory-pv-storage-brief-1-1536x864.png",1536,864,true],"2048x2048":["https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/09\/italy-factory-pv-storage-brief-1.png",1600,900,false],"trp-custom-language-flag":["https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/09\/italy-factory-pv-storage-brief-1-18x10.png",18,10,true],"woocommerce_thumbnail":["https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/09\/italy-factory-pv-storage-brief-1-300x300.png",300,300,true],"woocommerce_single":["https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/09\/italy-factory-pv-storage-brief-1-600x338.png",600,338,true],"woocommerce_gallery_thumbnail":["https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/09\/italy-factory-pv-storage-brief-1-100x100.png",100,100,true]},"uagb_author_info":{"display_name":"liu_director","author_link":"https:\/\/www.krlpower.com\/xh\/author\/liu_director\/"},"uagb_comment_info":0,"uagb_excerpt":"A preliminary Italian factory proposal uses four KRL 125 kW \/ 261 kWh all-in-one units and one LV parallel\/grid-connection cabinet. The design preserves existing Growatt PV and separates 500 kW installed PCS capacity from a proposed 200 kW operating limit.","_links":{"self":[{"href":"https:\/\/www.krlpower.com\/xh\/wp-json\/wp\/v2\/posts\/12929","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.krlpower.com\/xh\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.krlpower.com\/xh\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.krlpower.com\/xh\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.krlpower.com\/xh\/wp-json\/wp\/v2\/comments?post=12929"}],"version-history":[{"count":2,"href":"https:\/\/www.krlpower.com\/xh\/wp-json\/wp\/v2\/posts\/12929\/revisions"}],"predecessor-version":[{"id":12933,"href":"https:\/\/www.krlpower.com\/xh\/wp-json\/wp\/v2\/posts\/12929\/revisions\/12933"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.krlpower.com\/xh\/wp-json\/wp\/v2\/media\/12925"}],"wp:attachment":[{"href":"https:\/\/www.krlpower.com\/xh\/wp-json\/wp\/v2\/media?parent=12929"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.krlpower.com\/xh\/wp-json\/wp\/v2\/categories?post=12929"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.krlpower.com\/xh\/wp-json\/wp\/v2\/tags?post=12929"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}