{"id":12472,"date":"2026-08-12T09:49:52","date_gmt":"2026-08-12T09:49:52","guid":{"rendered":"https:\/\/www.krlpower.com\/?p=12472"},"modified":"2026-08-12T09:49:52","modified_gmt":"2026-08-12T09:49:52","slug":"commercial-energy-storage-system-nigeria-hospital","status":"publish","type":"post","link":"https:\/\/www.krlpower.com\/fr\/bess\/commercial-energy-storage-system-nigeria-hospital\/","title":{"rendered":"Syst\u00e8me commercial de stockage d'\u00e9nergie destin\u00e9 aux h\u00f4pitaux nig\u00e9rians"},"content":{"rendered":"<div data-elementor-type=\"wp-post\" data-elementor-id=\"12472\" class=\"elementor elementor-12472\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-a840141 auto-article-root e-flex e-con-boxed e-con e-parent\" data-id=\"a840141\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-1597bb6d auto-p elementor-widget elementor-widget-heading\" data-id=\"1597bb6d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">KRL Power a r\u00e9dig\u00e9 ce document <strong>syst\u00e8me commercial de stockage d'\u00e9nergie<\/strong> Guide pour un sc\u00e9nario d'approvisionnement anonymis\u00e9 d'un h\u00f4pital nig\u00e9rian : installation photovolta\u00efque existante, phase initiale de stockage de l'ordre de 250 kWh et objectif futur de puissance de 1 MW. L'acheteur a besoin d'un syst\u00e8me C&amp;I (commercial et industriel) destin\u00e9 \u00e0 une installation en ext\u00e9rieur, dot\u00e9 d'un onduleur int\u00e9gr\u00e9 et d'une garantie document\u00e9e couvrant la batterie et le syst\u00e8me de contr\u00f4le de puissance (PCS). Cet article propose \u00e0 l'h\u00f4pital, au ma\u00eetre d'\u0153uvre (EPC) et au consultant en \u00e9lectricit\u00e9 une s\u00e9quence d'approvisionnement permettant de d\u00e9finir les sp\u00e9cifications de la premi\u00e8re phase, de tester ses interfaces et de pr\u00e9server la marge n\u00e9cessaire \u00e0 une future extension.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c6c86f05 auto-image elementor-widget elementor-widget-image\" data-id=\"c6c86f05\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/08\/KRL-B241-Hospital-First-Phase-Planning-1024x576.jpg\" class=\"attachment-large size-large wp-image-12469\" alt=\"Armoire KRL-B241 de 125 kW et 241 kWh install\u00e9e dans une zone de service solaire d&#039;un h\u00f4pital, \u00e9quip\u00e9e d&#039;un socle d&#039;extension\" srcset=\"https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/08\/KRL-B241-Hospital-First-Phase-Planning-1024x576.jpg 1024w, https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/08\/KRL-B241-Hospital-First-Phase-Planning-300x169.jpg 300w, https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/08\/KRL-B241-Hospital-First-Phase-Planning-768x432.jpg 768w, https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/08\/KRL-B241-Hospital-First-Phase-Planning-600x338.jpg 600w, https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/08\/KRL-B241-Hospital-First-Phase-Planning.jpg 1280w\" sizes=\"(max-width: 1024px) 100vw, 1024px\"\/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-843af3e0 auto-p elementor-widget elementor-widget-heading\" data-id=\"843af3e0\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">La d\u00e9cision imm\u00e9diate consiste \u00e0 d\u00e9finir les sp\u00e9cifications op\u00e9rationnelles de la phase 1 et \u00e0 fournir les m\u00eames informations techniques \u00e0 tous les soumissionnaires. Une hi\u00e9rarchie de charge bien d\u00e9finie, une s\u00e9lection sp\u00e9cifique au mod\u00e8le, une interface photovolta\u00efque document\u00e9e et un plan d'extension des interfaces permettent \u00e0 l'h\u00f4pital de comparer des propositions compl\u00e8tes sur une base commune.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-011b28bd auto-h2 elementor-widget elementor-widget-heading\" data-id=\"011b28bd\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Utiliser le sc\u00e9nario d'approvisionnement comme liste des donn\u00e9es d'entr\u00e9e du projet<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-4ed4ebc1 auto-p elementor-widget elementor-widget-heading\" data-id=\"4ed4ebc1\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">This anonymized buyer requirement is a procurement scenario. The final project requires an electrical study, site survey, approvals and an approved equipment selection. The table separates the buyer&#x2019;s request from the information required for a project decision.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-7a4d1949 auto-table elementor-widget elementor-widget-text-editor\" data-id=\"7a4d1949\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<div class=\"ceai-table-wrap\" role=\"region\" aria-label=\"Tableau de donn\u00e9es d\u00e9filable\" tabindex=\"0\" data-columns=\"3\"><table><thead><tr><th scope=\"col\">Donn\u00e9es d'entr\u00e9e du projet issues de la fiche d'exigences<\/th><th scope=\"col\">Signification du terme \u00ab approvisionnement \u00bb<\/th><th scope=\"col\">Informations requises avant la s\u00e9lection finale<\/th><\/tr><\/thead><tbody><tr><td>Site d'un h\u00f4pital nig\u00e9rian<\/td><td>Examiner le comportement du r\u00e9seau local, l'exposition aux conditions m\u00e9t\u00e9orologiques, l'itin\u00e9raire d'importation et le plan de desserte du site<\/td><td>Adresse du site, conditions de conception environnementales et proc\u00e9dure d'autorisation locale<\/td><\/tr><tr><td>Installations photovolta\u00efques existantes<\/td><td>Mettre en place l'onduleur photovolta\u00efque, l'interface de commande et le dispositif de protection<\/td><td>Sch\u00e9ma unifilaire photovolta\u00efque, mod\u00e8le d'onduleur, micrologiciel et capacit\u00e9 CA\/CC disponible<\/td><\/tr><tr><td>Objectif initial : environ 250 kWh<\/td><td>S\u00e9lectionnez une cat\u00e9gorie de produits commercialis\u00e9s dont les performances \u00e9nerg\u00e9tiques se rapprochent de la plage requise.<\/td><td>Profil de charge essentielle, dur\u00e9e de fonctionnement cible, r\u00e9glage de la r\u00e9serve et charge auxiliaire<\/td><\/tr><tr><td>Objectif futur : 1 MW<\/td><td>Prot\u00e9ger les futurs appareillages de commutation, les syst\u00e8mes de commande, les terrains et les trac\u00e9s de c\u00e2bles<\/td><td>Calendrier de mise en \u0153uvre de l'extension, objectif de puissance, objectif \u00e9nerg\u00e9tique et modes de fonctionnement d\u00e9finitifs<\/td><\/tr><tr><td>Installation C&amp;I en ext\u00e9rieur<\/td><td>V\u00e9rifier les conditions relatives au bo\u00eetier, \u00e0 la fondation, \u00e0 l'acc\u00e8s, au levage et au passage des c\u00e2bles<\/td><td>Am\u00e9nagement du site, plans de g\u00e9nie civil, risques d'inondation et trac\u00e9s des c\u00e2bles<\/td><\/tr><tr><td>Onduleur int\u00e9gr\u00e9 et pr\u00e9f\u00e9rence pour le LiFePO4<\/td><td>Verify the actual battery&#x2013;PCS architecture and published model data<\/td><td>\u00c9tude sur la tension alternative, la configuration des phases, l'interface du g\u00e9n\u00e9rateur et les dispositifs de protection<\/td><\/tr><\/tbody><\/table><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-3fe445e9 auto-p elementor-widget elementor-widget-heading\" data-id=\"3fe445e9\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">La demande de 250 kWh correspond \u00e0 la puissance initiale. L'objectif de 1 MW correspond \u00e0 la puissance future. Chaque valeur doit s'appuyer sur ses propres bases de conception approuv\u00e9es, notamment en ce qui concerne les conditions d'exploitation, la protection, les syst\u00e8mes de commande et la disposition des \u00e9quipements. Le cahier des charges doit d\u00e9finir ces deux horizons afin que les fournisseurs puissent \u00e9tablir un devis pour l'ensemble de la premi\u00e8re phase et identifier les dispositions relatives \u00e0 l'extension.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-eae44823 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"eae44823\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">D\u00e9finir la hi\u00e9rarchie de charge de l'h\u00f4pital avant de s\u00e9lectionner la capacit\u00e9 \u00e9nerg\u00e9tique<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-1ef82c69 auto-p elementor-widget elementor-widget-heading\" data-id=\"1ef82c69\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">La demande \u00e9lectrique d'un h\u00f4pital comprend des charges aux cons\u00e9quences et aux modes de fonctionnement tr\u00e8s vari\u00e9s. Le total enregistr\u00e9 pour un site donn\u00e9 peut masquer les diff\u00e9rences entre un circuit de s\u00e9curit\u00e9 des personnes, une salle de diagnostic, la cha\u00eene du froid d'une pharmacie, une pompe \u00e0 eau et un bureau administratif. L'\u00e9quipe \u00e9lectrique doit \u00e9tablir un ordre de priorit\u00e9 \u00e0 partir du relev\u00e9 des charges du site avant de choisir la puissance nominale du tableau \u00e9lectrique ou du syst\u00e8me de contr\u00f4le de puissance (PCS).<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-339e11fd auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"339e11fd\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong>Group A &#x2014; continuity-critical circuits:<\/strong> circuits defined by the hospital&#x2019;s licensed electrical designer and protected through the approved hospital electrical architecture.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong>Group B &#x2014; clinical support circuits:<\/strong> les charges li\u00e9es aux laboratoires, \u00e0 la pharmacie, au diagnostic, aux communications, \u00e0 l'eau et aux services techniques du b\u00e2timent, selon un ordre de remise en service convenu.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong>Group C &#x2014; revenue and operations circuits:<\/strong> les charges li\u00e9es \u00e0 l'enregistrement, \u00e0 la facturation, \u00e0 l'\u00e9clairage, \u00e0 la cuisine ou \u00e0 l'h\u00e9bergement, s\u00e9lectionn\u00e9es par l'\u00e9quipe op\u00e9rationnelle de l'h\u00f4pital.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong>Group D &#x2014; deferrable circuits:<\/strong> loads that can be scheduled around the available energy window under the hospital&#x2019;s written operating rules.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-bb8094f6 auto-p elementor-widget elementor-widget-heading\" data-id=\"bb8094f6\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Pour chaque groupe, l\u2019ing\u00e9nieur de l\u2019\u00e9tablissement doit fournir les donn\u00e9es relatives \u00e0 la demande par intervalle, les hypoth\u00e8ses de d\u00e9marrage des moteurs, la dur\u00e9e d\u2019autonomie requise, les d\u00e9tails concernant l\u2019onduleur et le groupe \u00e9lectrog\u00e8ne existants, la r\u00e9serve de charge pr\u00e9vue et l\u2019historique de production photovolta\u00efque. Ces donn\u00e9es constituent une base \u00e9nerg\u00e9tique d\u00e9finie pour chaque fournisseur. Elles permettent \u00e9galement \u00e0 l\u2019h\u00f4pital de comparer des devis pr\u00e9liminaires portant sur les m\u00eames charges et le m\u00eame objectif d\u2019autonomie. Cette approche plus globale est conforme \u00e0 <strong><a href=\"https:\/\/www.krlpower.com\/fr\/bess\/how-to-design-commercial-energy-storage-system\/\" target=\"_blank\" style=\"color:#046bd2\">KRL Power&#x2019;s commercial energy storage system design guidance<\/a><\/strong>, qui part de l'objectif d'exploitation et des donn\u00e9es du site.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c1e6ea2b auto-h2 elementor-widget elementor-widget-heading\" data-id=\"c1e6ea2b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Utilisez la premi\u00e8re phase pour une charge de fonctionnement d\u00e9finie<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-9de5913c auto-p elementor-widget elementor-widget-heading\" data-id=\"9de5913c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Une armoire initiale d'une capacit\u00e9 de 250 kWh s'av\u00e8re utile lorsque le site d\u00e9finit \u00e0 l'avance son mode de fonctionnement. Il peut s'agir, par exemple, de l'autoconsommation d'\u00e9nergie solaire pendant une p\u00e9riode de la journ\u00e9e convenue, de la gestion de la demande pour certaines charges, du soutien d'un groupe \u00e9lectrog\u00e8ne selon une s\u00e9quence \u00e9crite, ou encore de l'alimentation de secours pour un groupe de charges essentielles d\u00e9fini. Chaque mode de fonctionnement n\u00e9cessite un programme de contr\u00f4le et un test de r\u00e9ception distincts.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-889fb711 auto-table elementor-widget elementor-widget-text-editor\" data-id=\"889fb711\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<div class=\"ceai-table-wrap\" role=\"region\" aria-label=\"Tableau de donn\u00e9es d\u00e9filable\" tabindex=\"0\" data-columns=\"4\"><table><thead><tr><th scope=\"col\">Service op\u00e9rationnel<\/th><th scope=\"col\">Fournitures destin\u00e9es \u00e0 l'h\u00f4pital<\/th><th scope=\"col\">Pi\u00e8ces justificatives \u00e0 joindre \u00e0 la proposition<\/th><th scope=\"col\">Preuve d'acceptation<\/th><\/tr><\/thead><tbody><tr><td>Autoconsommation solaire<\/td><td>Courbe de production photovolta\u00efque, charge diurne et p\u00e9riode tarifaire<\/td><td>Interface photovolta\u00efque, calendrier de charge et hypoth\u00e8ses d'exportation<\/td><td>\u00c9volution des relev\u00e9s indiquant les p\u00e9riodes de charge et de d\u00e9charge convenues<\/td><\/tr><tr><td>Prise en charge des charges essentielles<\/td><td>Circuits prioritaires et dur\u00e9e requise<\/td><td>Sch\u00e9ma unifilaire, s\u00e9quence de transfert et limite de puissance<\/td><td>Essai fonctionnel r\u00e9alis\u00e9 en pr\u00e9sence de t\u00e9moins, conform\u00e9ment au programme de charge approuv\u00e9<\/td><\/tr><tr><td>Coordination des g\u00e9n\u00e9rateurs<\/td><td>Puissance nominale du g\u00e9n\u00e9rateur, commandes et objectif en mati\u00e8re de carburant<\/td><td>Interface du g\u00e9n\u00e9rateur, autorisations de commande et verrouillages<\/td><td>S\u00e9quence test\u00e9e de d\u00e9marrage, de transfert de charge et de r\u00e9tablissement<\/td><\/tr><tr><td>Gestion de la demande<\/td><td>Point de comptage, structure tarifaire et objectif de consommation<\/td><td>Logique EMS, propri\u00e9taire du point de consigne et disposition des compteurs<\/td><td>Exportation des donn\u00e9es du compteur indiquant la plage horaire d'exploitation convenue<\/td><\/tr><\/tbody><\/table><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-156b9554 auto-p elementor-widget elementor-widget-heading\" data-id=\"156b9554\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">The hospital should assign one owner to each operating rule. The owner of the EMS dispatch logic, the owner of the PV interface, the owner of the transfer equipment and the owner of the operating schedule should appear in the project responsibility matrix. KRL&#x2019;s <strong><a href=\"https:\/\/www.krlpower.com\/fr\/bess\/ci-energy-storage-bms-pcs-ems-krl-power\/\" target=\"_blank\" style=\"color:#046bd2\">Pr\u00e9sentation g\u00e9n\u00e9rale des syst\u00e8mes BMS, PCS et EMS<\/a><\/strong> fournit un vocabulaire utile pour cette discussion, tandis que les documents de projet s\u00e9lectionn\u00e9s d\u00e9finissent les d\u00e9tails de l'interface de liaison.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-863b994f elementor-align-center auto-cta elementor-widget elementor-widget-button\" data-id=\"863b994f\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"button.default\">\n\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm\" href=\"#elementor-action%3Aaction%3Dpopup%3Aopen%26settings%3DeyJpZCI6Ijc5MSIsInRvZ2dsZSI6ZmFsc2V9\" target=\"_blank\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">Demander un examen du champ d'application du BESS pour un h\u00f4pital<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-bd8f8958 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"bd8f8958\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Comparer les options de baies KRL publi\u00e9es pour la phase de 250 kWh<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c858ab13 auto-p elementor-widget elementor-widget-heading\" data-id=\"c858ab13\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">The customer requirement is approximately 250 kWh. KRL&rsquo;s public catalogue lists two nearby 125 kW C&amp;I cabinet configurations. The selection depends on the approved load schedule, site environment, installation plan and future-system architecture.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-903dbf5f auto-table elementor-widget elementor-widget-text-editor\" data-id=\"903dbf5f\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<div class=\"ceai-table-wrap\" role=\"region\" aria-label=\"Tableau de donn\u00e9es d\u00e9filable\" tabindex=\"0\" data-columns=\"3\"><table><thead><tr><th scope=\"col\">D\u00e9cision<\/th><th scope=\"col\">Question concernant l'h\u00f4pital<\/th><th scope=\"col\">Justificatifs du projet<\/th><\/tr><\/thead><tbody><tr><td>\u00c9nergie<\/td><td>Quelle est l'\u00e9nergie de charge autoris\u00e9e que la premi\u00e8re phase doit fournir pendant la plage de fonctionnement indiqu\u00e9e ?<\/td><td>Donn\u00e9es relatives \u00e0 la demande par intervalle, programme de charge critique, d\u00e9finition des r\u00e9serves et calcul de l'\u00e9nergie utilisable<\/td><\/tr><tr><td>Puissance<\/td><td>Quelle puissance continue et de courte dur\u00e9e les circuits s\u00e9lectionn\u00e9s doivent-ils consommer, compte tenu des conditions de d\u00e9marrage des moteurs convenues ?<\/td><td>\u00c9tude de charge, caract\u00e9ristiques du moteur, analyse des dispositifs de protection et s\u00e9quence de transfert approuv\u00e9e<\/td><\/tr><tr><td>Expansion<\/td><td>Quelle sera la topologie d\u00e9finitive qui permettra d'atteindre l'objectif futur de 1 MW ?<\/td><td>Sch\u00e9ma unifilaire approuv\u00e9, \u00e9tude de l'installation de commutation, descriptif des commandes et plan d'implantation des \u00e9quipements<\/td><\/tr><\/tbody><\/table><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-132fdb41 auto-table elementor-widget elementor-widget-text-editor\" data-id=\"132fdb41\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<div class=\"ceai-table-wrap\" role=\"region\" aria-label=\"Tableau de donn\u00e9es d\u00e9filable\" tabindex=\"0\" data-columns=\"6\"><table><thead><tr><th scope=\"col\">Mod\u00e8le KRL publi\u00e9<\/th><th scope=\"col\">Puissance nominale en courant alternatif<\/th><th scope=\"col\">Puissance nominale<\/th><th scope=\"col\">Refroidissement \/ protection<\/th><th scope=\"col\">Signal d'extension publi\u00e9<\/th><th scope=\"col\">Conforme au cahier des charges du client<\/th><\/tr><\/thead><tbody><tr><td>KRL-B241<\/td><td>125 kW en r\u00e9seau et hors r\u00e9seau<\/td><td>241 kWh LiFePO\u2084<\/td><td>Climatiseur industriel ; IP54<\/td><td>Jusqu'\u00e0 10 unit\u00e9s en parall\u00e8le<\/td><td>Classe \u00e9nerg\u00e9tique publi\u00e9e la plus proche de la premi\u00e8re phase \u00e0 refroidissement par air demand\u00e9e<\/td><\/tr><tr><td>KRL-B261L<\/td><td>125 kW en r\u00e9seau et hors r\u00e9seau<\/td><td>261 kWh LiFePO4<\/td><td>Refroidissement par liquide ; bo\u00eetier de batterie IP65<\/td><td>Jusqu'\u00e0 10 unit\u00e9s en parall\u00e8le<\/td><td>Classe \u00e9nerg\u00e9tique la plus proche lorsque l'\u00e9quipe de projet privil\u00e9gie la configuration \u00e0 refroidissement par liquide telle qu'elle a \u00e9t\u00e9 publi\u00e9e<\/td><\/tr><\/tbody><\/table><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-0e074dac auto-p elementor-widget elementor-widget-heading\" data-id=\"0e074dac\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">The KRL-B241 public page lists a 120 kW PV input, 400\/230 Vac, 50\/60 Hz, a generator interface, RS485\/WiFi and a stated switching time below 10 ms. Its public dimensions are 1,190 &#xD7; 1,170 &#xD7; 2,260 mm and its stated weight is approximately 2,520 kg. The KRL-B261L page lists 120 kW PV input, 400\/230 Vac, 50\/60 Hz, a generator interface, RS485\/WiFi, a stated switching time below 10 ms and up to 10 parallel units. The <strong><a href=\"https:\/\/www.krlpower.com\/fr\/battery\/krl-b261l-125kw-261kwh\/\" target=\"_blank\" style=\"color:#046bd2\">Page produit KRL-B261L 125 kW \/ 261 kWh<\/a><\/strong> enregistre les d\u00e9tails du mod\u00e8le publi\u00e9s.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-f67bb828 auto-image elementor-widget elementor-widget-image\" data-id=\"f67bb828\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/08\/KRL-B261L-Hospital-PV-Interface-Review-1024x576.jpg\" class=\"attachment-large size-large wp-image-12470\" alt=\"Armoire \u00e0 refroidissement liquide KRL-B261L de 125 kW et 261 kWh, install\u00e9e \u00e0 c\u00f4t\u00e9 des \u00e9quipements d&#039;interface photovolta\u00efque de l&#039;h\u00f4pital\" srcset=\"https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/08\/KRL-B261L-Hospital-PV-Interface-Review-1024x576.jpg 1024w, https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/08\/KRL-B261L-Hospital-PV-Interface-Review-300x169.jpg 300w, https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/08\/KRL-B261L-Hospital-PV-Interface-Review-768x432.jpg 768w, https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/08\/KRL-B261L-Hospital-PV-Interface-Review-600x338.jpg 600w, https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/08\/KRL-B261L-Hospital-PV-Interface-Review.jpg 1280w\" sizes=\"(max-width: 1024px) 100vw, 1024px\"\/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-6a5ad570 auto-p elementor-widget elementor-widget-heading\" data-id=\"6a5ad570\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">The supplier must confirm the selected system&#x2019;s final topology, protection, controls, equipment arrangement and operating modes. The site engineer must also confirm the actual AC architecture, energy boundary, auxiliary consumption and operating limits before either cabinet enters a final proposal. Product-level source review can begin with the <strong><a href=\"https:\/\/www.krlpower.com\/fr\/battery\/krl-125kw-241kwh-bess\/\" target=\"_blank\" style=\"color:#046bd2\">Page produit KRL-B241 125 kW \/ 241 kWh<\/a><\/strong>.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-5c27ab60 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"5c27ab60\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Pr\u00e9ciser les limites de l'extension de 1 MW dans l'appel \u00e0 propositions de la premi\u00e8re phase<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-e4849985 auto-p elementor-widget elementor-widget-heading\" data-id=\"e4849985\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Un objectif de puissance future de 1 MW doit faire l'objet d'une mention explicite dans l'appel d'offres de la premi\u00e8re phase. Le cahier des charges, le plan d'implantation, le sch\u00e9ma unifilaire et le programme des commandes doivent respecter les limites d'extension approuv\u00e9es. La puissance utilisable future, la topologie des \u00e9quipements et les dispositifs de protection restent des d\u00e9cisions techniques propres \u00e0 chaque projet.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-e8d8f5a9 auto-h3 elementor-widget elementor-widget-heading\" data-id=\"e8d8f5a9\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Dispositions relatives aux installations \u00e9lectriques et aux travaux de g\u00e9nie civil<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-538fc19d auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"538fc19d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Pr\u00e9voir les emplacements n\u00e9cessaires pour les tableaux \u00e9lectriques basse tension, les trac\u00e9s des lignes d'alimentation et les emplacements des dispositifs de protection, conform\u00e9ment au concept d'extension approuv\u00e9.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Indiquez sur le sch\u00e9ma unifilaire le point final de raccordement commun, les points de comptage et le sch\u00e9ma de mise \u00e0 la terre et de mise au neutre.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Pr\u00e9voir les emplacements des \u00e9quipements, les voies d'acc\u00e8s aux \u00e9quipements, les parcours de levage, les tranch\u00e9es pour c\u00e2bles, le drainage et les espaces n\u00e9cessaires \u00e0 l'entretien pour chaque phase ult\u00e9rieure.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Consignez les points de raccordement photovolta\u00efques disponibles et les hypoth\u00e8ses relatives \u00e0 la croissance future du parc photovolta\u00efque s\u00e9par\u00e9ment du plan d'extension du syst\u00e8me de stockage d'\u00e9nergie par batterie (BESS).<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Int\u00e9grer dans le p\u00e9rim\u00e8tre du contrat EPC l\u2019\u00e9tude finale relative au niveau de d\u00e9faillance, l\u2019\u00e9tude de s\u00e9lectivit\u00e9 et les exigences en mati\u00e8re d\u2019autorisations locales.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-cc4455e9 auto-h3 elementor-widget elementor-widget-heading\" data-id=\"cc4455e9\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Mesures de contr\u00f4le et dispositions d'exploitation<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-fdc9f9ba auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"fdc9f9ba\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">D\u00e9finir l'autorit\u00e9 de commande du syst\u00e8me de gestion de l'\u00e9nergie (EMS) pour l'ensemble des \u00e9tablissements hospitaliers, les commandes des installations photovolta\u00efques, les commandes des groupes \u00e9lectrog\u00e8nes, le syst\u00e8me de contr\u00f4le et de commande (PCS) du syst\u00e8me de stockage d'\u00e9nergie par batterie (BESS) et toute passerelle de gestion technique des b\u00e2timents.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Tenez \u00e0 jour un registre soumis \u00e0 un contr\u00f4le de version pour les cartes des compteurs, les adresses r\u00e9seau, les priorit\u00e9s d'alarme, les versions de micrologiciel et les fichiers de param\u00e8tres.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Pr\u00e9ciser la s\u00e9quence de fonctionnement pour le fonctionnement normal sur le r\u00e9seau, la recharge solaire, le soutien par g\u00e9n\u00e9rateur, la maintenance programm\u00e9e, le fonctionnement en \u00eelot (le cas \u00e9ch\u00e9ant) et le r\u00e9tablissement du r\u00e9seau.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Mettre en place un syst\u00e8me d'acc\u00e8s bas\u00e9 sur les r\u00f4les pour le personnel d'exploitation, le personnel de service et le responsable du suivi du projet.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-75c9d3d5 auto-h3 elementor-widget elementor-widget-heading\" data-id=\"75c9d3d5\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Dispositions commerciales<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-476ed62e auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"476ed62e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Demandez une nomenclature d\u00e9taill\u00e9e de la premi\u00e8re phase, ainsi qu'un tableau s\u00e9par\u00e9 indiquant les marges pr\u00e9vues pour les extensions.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Demandez \u00e0 chaque soumissionnaire de pr\u00e9ciser ce qui est inclus et ce qui est exclu en ce qui concerne les travaux de g\u00e9nie civil, les appareillages de commutation, les dispositifs de protection, l'int\u00e9gration des syst\u00e8mes de contr\u00f4le, le fret, la mise en service et les autorisations locales.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Request product-specific warranty documents, operating conditions, service contacts and claim-evidence requirements. Compare each bidder&#x2019;s model code, scope owner and claims-evidence route.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Pr\u00e9parer le dossier de transfert des documents : plans, exportations des param\u00e8tres, num\u00e9ros de s\u00e9rie, rapports d'essais, manuels d'utilisation et dossiers de formation.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-f8b8d0b2 auto-p elementor-widget elementor-widget-heading\" data-id=\"f8b8d0b2\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">The KRL product catalogue currently contains both cabinet and container product classes. A future 1 MW requirement warrants a dedicated technical comparison with KRL&#x2019;s published <strong><a href=\"https:\/\/www.krlpower.com\/fr\/battery\/krl-b2m6l-1-2mw-2-6mwh\/\" target=\"_blank\" style=\"color:#046bd2\">Configuration de conteneurs de la classe 1 MW \/ 2 MWh<\/a><\/strong>. Son tableau public sert de r\u00e9f\u00e9rence. La conception de l'extension de l'h\u00f4pital reste soumise \u00e0 l'\u00e9tude finale du projet.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-544add18 auto-image elementor-widget elementor-widget-image\" data-id=\"544add18\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/08\/KRL-B2M6L-Hospital-Expansion-Boundary-1024x576.jpg\" class=\"attachment-large size-large wp-image-12471\" alt=\"Conteneur KRL-B2M6L situ\u00e9 \u00e0 c\u00f4t\u00e9 du parc \u00e9lectrique d&#039;un h\u00f4pital, illustrant les projets d&#039;extension futurs\" srcset=\"https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/08\/KRL-B2M6L-Hospital-Expansion-Boundary-1024x576.jpg 1024w, https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/08\/KRL-B2M6L-Hospital-Expansion-Boundary-300x169.jpg 300w, https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/08\/KRL-B2M6L-Hospital-Expansion-Boundary-768x432.jpg 768w, https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/08\/KRL-B2M6L-Hospital-Expansion-Boundary-600x338.jpg 600w, https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/08\/KRL-B2M6L-Hospital-Expansion-Boundary.jpg 1280w\" sizes=\"(max-width: 1024px) 100vw, 1024px\"\/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-8abbe9e8 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"8abbe9e8\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Examiner l'interface photovolta\u00efque existante avant de lancer l'appel d'offres<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-e5f8f136 auto-p elementor-widget elementor-widget-heading\" data-id=\"e5f8f136\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">The hospital&#x2019;s existing solar PV must enter the technical review as a defined interface. Give each shortlisted supplier the PV inverter model, AC or DC coupling arrangement, installed capacity, protection layout, communication protocol and operating settings. The selected solution needs a model-specific engineering review.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-39ca5dae auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"39ca5dae\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Fiches techniques des onduleurs photovolta\u00efques et registres de mise en service sur site.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Sch\u00e9ma unifilaire actuel et liste des \u00e9l\u00e9ments du tableau de distribution.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Historique de la production photovolta\u00efque et donn\u00e9es des compteurs d'importation de l'h\u00f4pital.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Sch\u00e9mas des \u00e9quipements de secours et de transfert actuels.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Donn\u00e9es figurant sur la plaque signal\u00e9tique des groupes \u00e9lectrog\u00e8nes existants et informations relatives aux contr\u00f4leurs, lorsque ces groupes font toujours partie du site.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Carte des communications, r\u00e8gles relatives \u00e0 Internet et \u00e0 la cybers\u00e9curit\u00e9, ainsi que liste des contacts \u00e0 contacter en cas d'alerte.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-96018dd0 auto-p elementor-widget elementor-widget-heading\" data-id=\"96018dd0\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Dans le cadre d'une s\u00e9lection concr\u00e8te, l'\u00e9quipe hospitali\u00e8re peut examiner <strong><a href=\"https:\/\/www.krlpower.com\/fr\/bess\/how-to-choose-commercial-energy-storage-system\/\" target=\"_blank\" style=\"color:#046bd2\">KRL Power&rsquo;s C&amp;I system-selection guide<\/a><\/strong> et le <strong><a href=\"https:\/\/www.krlpower.com\/fr\/bess\/100kw-energy-storage-inverter\/\" target=\"_blank\" style=\"color:#046bd2\">Guide sur les onduleurs pour syst\u00e8mes de stockage d'\u00e9nergie de 100 kW<\/a><\/strong>. La proposition finale doit pr\u00e9ciser la combinaison de mod\u00e8les retenue, les plans, les limites de contr\u00f4le et le calendrier des essais.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-437e47a9 elementor-align-center auto-cta elementor-widget elementor-widget-button\" data-id=\"437e47a9\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"button.default\">\n\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm\" href=\"#elementor-action%3Aaction%3Dpopup%3Aopen%26settings%3DeyJpZCI6Ijc5MSIsInRvZ2dsZSI6ZmFsc2V9\" target=\"_blank\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">Demander une liste de contr\u00f4le pour un appel d'offres concernant un syst\u00e8me de stockage d'\u00e9nergie par batterie (BESS) de 250 kWh destin\u00e9 \u00e0 un h\u00f4pital<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-cb7a6ef0 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"cb7a6ef0\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">\u00c9laborer un dossier de proposition pr\u00eat \u00e0 \u00eatre soumis \u00e0 un h\u00f4pital<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-65e34f59 auto-p elementor-widget elementor-widget-heading\" data-id=\"65e34f59\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Un dossier d'appel d'offres coh\u00e9rent offre \u00e0 chaque soumissionnaire les m\u00eames r\u00e9f\u00e9rences en mati\u00e8re d'\u00e9quipement, d'int\u00e9gration, de mise en service et d'\u00e9tendue des prestations. Il permet \u00e9galement de comparer clairement les offres portant sur l'ensemble du projet et les prix relatifs \u00e0 des \u00e9quipements partiels.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-18ff04b0 auto-table elementor-widget elementor-widget-text-editor\" data-id=\"18ff04b0\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<div class=\"ceai-table-wrap\" role=\"region\" aria-label=\"Tableau de donn\u00e9es d\u00e9filable\" tabindex=\"0\" data-columns=\"2\"><table><thead><tr><th scope=\"col\">Exigences relatives \u00e0 la proposition<\/th><th scope=\"col\">Pourquoi cela doit figurer dans la demande<\/th><\/tr><\/thead><tbody><tr><td>Num\u00e9ro de mod\u00e8le exact du BESS et du PCS<\/td><td>Associe chaque param\u00e8tre indiqu\u00e9 \u00e0 un produit identifi\u00e9<\/td><\/tr><tr><td>Puissance nominale et \u00e9nergie nominale<\/td><td>D\u00e9finit le point de d\u00e9part publi\u00e9 pour le calcul du projet<\/td><\/tr><tr><td>Base de calcul de l'\u00e9nergie utile<\/td><td>Affiche la plage de fonctionnement, la r\u00e9serve, la consommation auxiliaire et les limites de conversion<\/td><\/tr><tr><td>Interfaces photovolta\u00efques, de g\u00e9n\u00e9rateurs et de raccordement au r\u00e9seau<\/td><td>D\u00e9finit la connexion et le p\u00e9rim\u00e8tre de contr\u00f4le<\/td><\/tr><tr><td>Calendrier des charges essentielles<\/td><td>\u00c9tablit un lien entre le fonctionnement sur batterie et les priorit\u00e9s de continuit\u00e9 des soins hospitaliers<\/td><\/tr><tr><td>Am\u00e9nagement du site et exigences en mati\u00e8re de g\u00e9nie civil<\/td><td>D\u00e9finit les responsabilit\u00e9s en mati\u00e8re de pose, de fondations, de drainage, de c\u00e2blage et de d\u00e9gagements<\/td><\/tr><tr><td>Calendrier des mesures de protection et de contr\u00f4le<\/td><td>D\u00e9finit la propri\u00e9t\u00e9 des compteurs, l'acheminement des alarmes et la hi\u00e9rarchie des commandes<\/td><\/tr><tr><td>Plan de mise en service et de r\u00e9ception<\/td><td>D\u00e9finit les \u00e9l\u00e9ments de preuve requis avant le transfert<\/td><\/tr><tr><td>Tableau des garanties et des prestations de service<\/td><td>Pr\u00e9cise les \u00e9quipements couverts, les conditions d'exploitation, la proc\u00e9dure \u00e0 suivre en cas d'incident et les pi\u00e8ces justificatives \u00e0 fournir pour les d\u00e9clarations de sinistre<\/td><\/tr><\/tbody><\/table><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-dd690398 auto-p elementor-widget elementor-widget-heading\" data-id=\"dd690398\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">KRL Power can review this package with the hospital&#x2019;s selected load schedule and electrical documents. The <strong><a href=\"https:\/\/www.krlpower.com\/fr\/piles\/ci-energy-storage-system\/\" target=\"_blank\" style=\"color:#046bd2\">Gamme de syst\u00e8mes de stockage d'\u00e9nergie KRL C&amp;I<\/a><\/strong> fournit un point de d\u00e9part valid\u00e9 pour la famille de produits. La proposition de projet doit identifier une configuration pr\u00e9cise ainsi que les responsabilit\u00e9s qui y sont associ\u00e9es.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-6ff6d6e7 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"6ff6d6e7\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Planifier les tests de r\u00e9ception en fonction du d\u00e9roulement des op\u00e9rations hospitali\u00e8res<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-74678ce2 auto-p elementor-widget elementor-widget-heading\" data-id=\"74678ce2\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Le plan de transfert doit respecter les obligations op\u00e9rationnelles stipul\u00e9es dans le contrat. Une d\u00e9monstration du produit prend toute sa valeur lorsqu\u2019elle permet de v\u00e9rifier les limites de puissance convenues, le parcours de surveillance, la r\u00e9ponse aux alarmes et la s\u00e9quence de r\u00e9tablissement.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-4b5af2dd auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"4b5af2dd\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">V\u00e9rifier l'identit\u00e9 de l'\u00e9quipement, son num\u00e9ro de s\u00e9rie et le sch\u00e9ma unifilaire de l'installation.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">V\u00e9rifiez le bar\u00e8me de facturation photovolta\u00efque convenu ainsi que les relev\u00e9s des compteurs.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Testez la s\u00e9quence de chargement prioritaire approuv\u00e9e par l'\u00e9quipe charg\u00e9e des installations de l'h\u00f4pital.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">V\u00e9rifier les signaux de communication, la transmission des alarmes, les commandes d'urgence et la responsabilit\u00e9 des commandes.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Consigner la coordination du g\u00e9n\u00e9rateur lorsqu'elle est pr\u00e9vue dans le mode de fonctionnement approuv\u00e9.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Exportez les param\u00e8tres d\u00e9finitifs, le registre du micrologiciel et la matrice d'acc\u00e8s des utilisateurs.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Enregistrez les pr\u00e9sences aux formations, les consignes d'entretien et les contacts en cas d'escalade.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Approuver un calendrier des contr\u00f4les de conformit\u00e9 qui d\u00e9finit les responsabilit\u00e9s de l'h\u00f4pital, de l'EPC et du fournisseur pour chaque contr\u00f4le et chaque rapport de cl\u00f4ture.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a9a96ab5 auto-p elementor-widget elementor-widget-heading\" data-id=\"a9a96ab5\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Ces donn\u00e9es aident l'h\u00f4pital \u00e0 mener \u00e0 bien la premi\u00e8re phase et \u00e0 pr\u00e9parer une extension en bonne et due forme. <strong><a href=\"https:\/\/www.krlpower.com\/fr\/bess\/battery-backup-for-power-outages-commercial-ess\/\" target=\"_blank\" style=\"color:#046bd2\">KRL&#x2019;s commercial backup-power guidance<\/a><\/strong> peut aider \u00e0 d\u00e9finir les questions relatives \u00e0 la continuit\u00e9 qui doivent figurer dans le plan op\u00e9rationnel.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d2cce301 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"d2cce301\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Parcours d\u00e9cisionnel pour le sc\u00e9nario d'approvisionnement hospitalier<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-21b4a8d7 auto-p elementor-widget elementor-widget-heading\" data-id=\"21b4a8d7\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Le sc\u00e9nario d'approvisionnement suit un encha\u00eenement clair : d\u00e9finir la hi\u00e9rarchie des charges de l'h\u00f4pital et les missions de la premi\u00e8re phase ; choisir une classe de 241 kWh ou 261 kWh figurant dans les publications \u00e0 l'issue de l'\u00e9tude \u00e9lectrique ; pr\u00e9voir la capacit\u00e9 des appareillages de commutation, de l'agencement et des commandes en fonction de l'\u00e9chelle future approuv\u00e9e ; et comparer les propositions des fournisseurs \u00e0 l'aide d'une matrice technique et commerciale unique.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-93e2ff29 auto-p elementor-widget elementor-widget-heading\" data-id=\"93e2ff29\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Ce processus permet de transformer une demande d'environ 250 kWh en un programme contr\u00f4l\u00e9 d'acquisition de solutions de stockage pour le secteur commercial et industriel. Il offre \u00e0 l'h\u00f4pital une feuille de route document\u00e9e pour atteindre son objectif de 1 MW et r\u00e9partit les responsabilit\u00e9s entre les \u00e9quipes charg\u00e9es de l'installation photovolta\u00efque, du syst\u00e8me de stockage d'\u00e9nergie par batterie (BESS), des travaux \u00e9lectriques sur site et de l'exploitation.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-84a5a3ed elementor-align-center auto-cta elementor-widget elementor-widget-button\" data-id=\"84a5a3ed\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"button.default\">\n\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm\" href=\"#elementor-action%3Aaction%3Dpopup%3Aopen%26settings%3DeyJpZCI6Ijc5MSIsInRvZ2dsZSI6ZmFsc2V9\" target=\"_blank\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">Demander un examen de la proposition BESS d'un h\u00f4pital<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-c392ff6a e-con-full auto-faq e-flex e-con e-child\" data-id=\"c392ff6a\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-527edf36 elementor-widget elementor-widget-heading\" data-id=\"527edf36\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">FAQ<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-7c8ab23f elementor-widget elementor-widget-n-accordion\" data-id=\"7c8ab23f\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings='{\"default_state\":\"all_collapsed\",\"max_items_expended\":\"one\",\"n_accordion_animation_duration\":{\"unit\":\"ms\",\"size\":400,\"sizes\":[]}}' data-widget_type=\"nested-accordion.default\">\n\t\t\t\t\t\t\t<div class=\"e-n-accordion\" aria-label=\"Accord\u00e9on. Ouvrez les liens \u00e0 l&#039;aide de la touche Entr\u00e9e ou de la barre d&#039;espace, fermez-les \u00e0 l&#039;aide de la touche \u00c9chap et naviguez \u00e0 l&#039;aide des touches fl\u00e9ch\u00e9es.\">\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2080\" class=\"e-n-accordion-item\">\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"1\" tabindex=\"0\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2080\">\n\t\t\t\t\t<span class=\"e-n-accordion-item-title-header\"><div class=\"e-n-accordion-item-title-text\"> De quelles informations un h\u00f4pital a-t-il besoin avant de faire une demande de stockage par batterie ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class=\"e-n-accordion-item-title-icon\">\n\t\t\t<span class=\"e-opened\"><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-minus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h384c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t\t<span class=\"e-closed\"><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-plus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H272V64c0-17.67-14.33-32-32-32h-32c-17.67 0-32 14.33-32 32v144H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h144v144c0 17.67 14.33 32 32 32h32c17.67 0 32-14.33 32-32V304h144c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2080\" class=\"elementor-element elementor-element-e59b063f e-con-full e-flex e-con e-child\" data-id=\"e59b063f\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-3a82090f elementor-widget elementor-widget-heading\" data-id=\"3a82090f\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Veuillez fournir la hi\u00e9rarchie des charges essentielles, les donn\u00e9es relatives aux charges par intervalle, la dur\u00e9e de soutien requise, les caract\u00e9ristiques de l'onduleur solaire, les donn\u00e9es relatives au g\u00e9n\u00e9rateur, le sch\u00e9ma unifilaire, le plan d'implantation et les modes de fonctionnement souhait\u00e9s.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2081\" class=\"e-n-accordion-item\">\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"2\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2081\">\n\t\t\t\t\t<span class=\"e-n-accordion-item-title-header\"><div class=\"e-n-accordion-item-title-text\"> \u00ab Environ 250 kWh \u00bb, s'agit-il du nom d'un mod\u00e8le de KRL Power ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class=\"e-n-accordion-item-title-icon\">\n\t\t\t<span class=\"e-opened\"><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-minus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h384c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t\t<span class=\"e-closed\"><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-plus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H272V64c0-17.67-14.33-32-32-32h-32c-17.67 0-32 14.33-32 32v144H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h144v144c0 17.67 14.33 32 32 32h32c17.67 0 32-14.33 32-32V304h144c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2081\" class=\"elementor-element elementor-element-73d65391 e-con-full e-flex e-con e-child\" data-id=\"73d65391\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-a79bc60f elementor-widget elementor-widget-heading\" data-id=\"a79bc60f\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">It is a customer energy target. KRL&#x2019;s publicly listed nearby cabinet options include the 241 kWh KRL-B241 and the 261 kWh KRL-B261L. The final selection follows the approved site design.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2082\" class=\"e-n-accordion-item\">\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"3\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2082\">\n\t\t\t\t\t<span class=\"e-n-accordion-item-title-header\"><div class=\"e-n-accordion-item-title-text\"> Comment un h\u00f4pital calcule-t-il l'autonomie du syst\u00e8me BESS ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class=\"e-n-accordion-item-title-icon\">\n\t\t\t<span class=\"e-opened\"><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-minus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h384c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t\t<span class=\"e-closed\"><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-plus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H272V64c0-17.67-14.33-32-32-32h-32c-17.67 0-32 14.33-32 32v144H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h144v144c0 17.67 14.33 32 32 32h32c17.67 0 32-14.33 32-32V304h144c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2082\" class=\"elementor-element elementor-element-0d0cbb70 e-con-full e-flex e-con e-child\" data-id=\"0d0cbb70\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-e9d8a802 elementor-widget elementor-widget-heading\" data-id=\"e9d8a802\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">L'ing\u00e9nieur de projet calcule la dur\u00e9e de fonctionnement \u00e0 partir du programme de charge approuv\u00e9, de la limite d'\u00e9nergie utilisable, du r\u00e9glage de la r\u00e9serve, de la consommation des \u00e9quipements auxiliaires, des pertes de conversion et des conditions d'exploitation de la configuration choisie.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2083\" class=\"e-n-accordion-item\">\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"4\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2083\">\n\t\t\t\t\t<span class=\"e-n-accordion-item-title-header\"><div class=\"e-n-accordion-item-title-text\"> Le syst\u00e8me BESS initial d'un h\u00f4pital peut-il \u00eatre \u00e9tendu pour atteindre une puissance de 1 MW ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class=\"e-n-accordion-item-title-icon\">\n\t\t\t<span class=\"e-opened\"><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-minus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h384c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t\t<span class=\"e-closed\"><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-plus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H272V64c0-17.67-14.33-32-32-32h-32c-17.67 0-32 14.33-32 32v144H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h144v144c0 17.67 14.33 32 32 32h32c17.67 0 32-14.33 32-32V304h144c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2083\" class=\"elementor-element elementor-element-3173c8b0 e-con-full e-flex e-con e-child\" data-id=\"3173c8b0\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-0d680198 elementor-widget elementor-widget-heading\" data-id=\"0d680198\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Un plan par \u00e9tapes peut favoriser la croissance future lorsque les appareillages de commutation, les dispositifs de protection, le trac\u00e9 des c\u00e2bles, les syst\u00e8mes de commande, l'agencement et les limites commerciales sont con\u00e7us en fonction du concept d'extension approuv\u00e9.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2084\" class=\"e-n-accordion-item\">\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"5\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2084\">\n\t\t\t\t\t<span class=\"e-n-accordion-item-title-header\"><div class=\"e-n-accordion-item-title-text\"> Quel mod\u00e8le KRL correspond le mieux \u00e0 une demande de 250 kWh pour un syst\u00e8me \u00e0 refroidissement par air ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class=\"e-n-accordion-item-title-icon\">\n\t\t\t<span class=\"e-opened\"><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-minus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h384c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t\t<span class=\"e-closed\"><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-plus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H272V64c0-17.67-14.33-32-32-32h-32c-17.67 0-32 14.33-32 32v144H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h144v144c0 17.67 14.33 32 32 32h32c17.67 0 32-14.33 32-32V304h144c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2084\" class=\"elementor-element elementor-element-82ba040f e-con-full e-flex e-con e-child\" data-id=\"82ba040f\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-80d9957e elementor-widget elementor-widget-heading\" data-id=\"80d9957e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Le mod\u00e8le KRL-B241 commercialis\u00e9 pr\u00e9sente une \u00e9nergie nominale de 241 kWh, une puissance nominale en courant alternatif de 125 kW, une climatisation industrielle et un indice de protection IP54. L'\u00e9quipe charg\u00e9e du projet doit examiner les conditions r\u00e9elles du site ainsi que l'architecture du syst\u00e8me.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2085\" class=\"e-n-accordion-item\">\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"6\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2085\">\n\t\t\t\t\t<span class=\"e-n-accordion-item-title-header\"><div class=\"e-n-accordion-item-title-text\"> Qu'apporte le mod\u00e8le KRL-B261L \u00e0 ce comparatif ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class=\"e-n-accordion-item-title-icon\">\n\t\t\t<span class=\"e-opened\"><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-minus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h384c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t\t<span class=\"e-closed\"><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-plus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H272V64c0-17.67-14.33-32-32-32h-32c-17.67 0-32 14.33-32 32v144H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h144v144c0 17.67 14.33 32 32 32h32c17.67 0 32-14.33 32-32V304h144c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2085\" class=\"elementor-element elementor-element-0101ad33 e-con-full e-flex e-con e-child\" data-id=\"0101ad33\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-da9ae7f2 elementor-widget elementor-widget-heading\" data-id=\"da9ae7f2\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Le mod\u00e8le KRL-B261L commercialis\u00e9 pr\u00e9sente une capacit\u00e9 nominale de 261 kWh, une puissance nominale en courant alternatif de 125 kW, un syst\u00e8me de refroidissement par liquide et un bo\u00eetier de batterie conforme \u00e0 la norme IP65. Il n\u00e9cessite une \u00e9tude de projet sp\u00e9cifique au mod\u00e8le.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2086\" class=\"e-n-accordion-item\">\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"7\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2086\">\n\t\t\t\t\t<span class=\"e-n-accordion-item-title-header\"><div class=\"e-n-accordion-item-title-text\"> Le syst\u00e8me BESS peut-il fonctionner avec les installations photovolta\u00efques solaires existantes de l'h\u00f4pital ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class=\"e-n-accordion-item-title-icon\">\n\t\t\t<span class=\"e-opened\"><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-minus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h384c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t\t<span class=\"e-closed\"><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-plus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H272V64c0-17.67-14.33-32-32-32h-32c-17.67 0-32 14.33-32 32v144H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h144v144c0 17.67 14.33 32 32 32h32c17.67 0 32-14.33 32-32V304h144c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2086\" class=\"elementor-element elementor-element-8b83002a e-con-full e-flex e-con e-child\" data-id=\"8b83002a\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-991d15e1 elementor-widget elementor-widget-heading\" data-id=\"991d15e1\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">L'architecture du syst\u00e8me de stockage d'\u00e9nergie par batterie (BESS) choisie doit \u00eatre v\u00e9rifi\u00e9e en fonction du mod\u00e8le pr\u00e9cis d'onduleur photovolta\u00efque, du mode de couplage, de la tension, des dispositifs de protection, de l'interface de communication et des param\u00e8tres de fonctionnement.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2087\" class=\"e-n-accordion-item\">\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"8\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2087\">\n\t\t\t\t\t<span class=\"e-n-accordion-item-title-header\"><div class=\"e-n-accordion-item-title-text\"> Quels \u00e9l\u00e9ments un h\u00f4pital doit-il inclure dans un sch\u00e9ma unifilaire de son syst\u00e8me de stockage d'\u00e9nergie ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class=\"e-n-accordion-item-title-icon\">\n\t\t\t<span class=\"e-opened\"><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-minus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h384c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t\t<span class=\"e-closed\"><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-plus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H272V64c0-17.67-14.33-32-32-32h-32c-17.67 0-32 14.33-32 32v144H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h144v144c0 17.67 14.33 32 32 32h32c17.67 0 32-14.33 32-32V304h144c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2087\" class=\"elementor-element elementor-element-3f0ba18a e-con-full e-flex e-con e-child\" data-id=\"3f0ba18a\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-fbff22c3 elementor-widget elementor-widget-heading\" data-id=\"fbff22c3\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Inclure le syst\u00e8me de stockage d'\u00e9nergie (BESS), le syst\u00e8me de contr\u00f4le de puissance (PCS), le syst\u00e8me photovolta\u00efque (PV), le groupe \u00e9lectrog\u00e8ne le cas \u00e9ch\u00e9ant, le raccordement au r\u00e9seau public, les points de comptage, les \u00e9quipements de protection, les \u00e9quipements de transfert, les tableaux de charges essentielles, le dispositif de mise \u00e0 la terre et les interfaces de commande.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2088\" class=\"e-n-accordion-item\">\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"9\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2088\">\n\t\t\t\t\t<span class=\"e-n-accordion-item-title-header\"><div class=\"e-n-accordion-item-title-text\"> Qui devrait g\u00e9rer la r\u00e9partition des BESS dans les h\u00f4pitaux ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class=\"e-n-accordion-item-title-icon\">\n\t\t\t<span class=\"e-opened\"><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-minus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h384c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t\t<span class=\"e-closed\"><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-plus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H272V64c0-17.67-14.33-32-32-32h-32c-17.67 0-32 14.33-32 32v144H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h144v144c0 17.67 14.33 32 32 32h32c17.67 0 32-14.33 32-32V304h144c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2088\" class=\"elementor-element elementor-element-abcf0857 e-con-full e-flex e-con e-child\" data-id=\"abcf0857\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-1144f046 elementor-widget elementor-widget-heading\" data-id=\"1144f046\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Le calendrier de contr\u00f4le du projet doit pr\u00e9ciser l'autorit\u00e9 comp\u00e9tente pour les points de consigne du syst\u00e8me de gestion de l'\u00e9nergie (EMS), la coordination des grandeurs r\u00e9elles (PV), les commandes des g\u00e9n\u00e9rateurs, les alarmes, les commandes d'urgence et l'acc\u00e8s des op\u00e9rateurs.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2089\" class=\"e-n-accordion-item\">\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"10\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2089\">\n\t\t\t\t\t<span class=\"e-n-accordion-item-title-header\"><div class=\"e-n-accordion-item-title-text\"> Quels tests de r\u00e9ception doivent \u00eatre inclus dans la passation de service d'un syst\u00e8me BESS hospitalier ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class=\"e-n-accordion-item-title-icon\">\n\t\t\t<span class=\"e-opened\"><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-minus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h384c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t\t<span class=\"e-closed\"><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-plus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H272V64c0-17.67-14.33-32-32-32h-32c-17.67 0-32 14.33-32 32v144H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h144v144c0 17.67 14.33 32 32 32h32c17.67 0 32-14.33 32-32V304h144c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2089\" class=\"elementor-element elementor-element-6ba1c848 e-con-full e-flex e-con e-child\" data-id=\"6ba1c848\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-191fcd14 elementor-widget elementor-widget-heading\" data-id=\"191fcd14\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Tester les modes de fonctionnement pr\u00e9vus dans le contrat, l'ordre de priorit\u00e9 des charges, les communications, les alarmes, les commandes d'urgence, les donn\u00e9es des compteurs, le processus de remise en service et la remise de la documentation.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-20810\" class=\"e-n-accordion-item\">\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"11\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-20810\">\n\t\t\t\t\t<span class=\"e-n-accordion-item-title-header\"><div class=\"e-n-accordion-item-title-text\"> Comment comparer les conditions de garantie ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class=\"e-n-accordion-item-title-icon\">\n\t\t\t<span class=\"e-opened\"><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-minus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h384c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t\t<span class=\"e-closed\"><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-plus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H272V64c0-17.67-14.33-32-32-32h-32c-17.67 0-32 14.33-32 32v144H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h144v144c0 17.67 14.33 32 32 32h32c17.67 0 32-14.33 32-32V304h144c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-20810\" class=\"elementor-element elementor-element-cb8768ba e-con-full e-flex e-con e-child\" data-id=\"cb8768ba\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-635b7bcd elementor-widget elementor-widget-heading\" data-id=\"635b7bcd\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Comparez les \u00e9quipements couverts, les conditions d'exploitation, les limites de capacit\u00e9 ou de performance (le cas \u00e9ch\u00e9ant), les responsabilit\u00e9s en mati\u00e8re d'entretien, les exigences en mati\u00e8re de justificatifs, les exclusions et la proc\u00e9dure de d\u00e9claration de sinistre.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-20811\" class=\"e-n-accordion-item\">\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"12\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-20811\">\n\t\t\t\t\t<span class=\"e-n-accordion-item-title-header\"><div class=\"e-n-accordion-item-title-text\"> Quels sont les documents utiles pour un futur projet d'extension du BESS ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class=\"e-n-accordion-item-title-icon\">\n\t\t\t<span class=\"e-opened\"><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-minus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h384c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t\t<span class=\"e-closed\"><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-plus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H272V64c0-17.67-14.33-32-32-32h-32c-17.67 0-32 14.33-32 32v144H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h144v144c0 17.67 14.33 32 32 32h32c17.67 0 32-14.33 32-32V304h144c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-20811\" class=\"elementor-element elementor-element-dc355d5b e-con-full e-flex e-con e-child\" data-id=\"dc355d5b\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-8c0b090b elementor-widget elementor-widget-heading\" data-id=\"8c0b090b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Conserver les plans d\u00e9finitifs, le registre des \u00e9quipements, les dossiers relatifs aux dispositifs de protection, le plan de localisation des compteurs, le plan du r\u00e9seau, les exportations des param\u00e8tres, la liste des micrologiciels, les rapports d'essais, l'historique d'entretien et les bases de conception de l'extension.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-20812\" class=\"e-n-accordion-item\">\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"13\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-20812\">\n\t\t\t\t\t<span class=\"e-n-accordion-item-title-header\"><div class=\"e-n-accordion-item-title-text\"> Quelle serait la premi\u00e8re mesure appropri\u00e9e pour un h\u00f4pital nig\u00e9rian disposant d\u00e9j\u00e0 d'une installation photovolta\u00efque ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class=\"e-n-accordion-item-title-icon\">\n\t\t\t<span class=\"e-opened\"><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-minus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h384c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t\t<span class=\"e-closed\"><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-plus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H272V64c0-17.67-14.33-32-32-32h-32c-17.67 0-32 14.33-32 32v144H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h144v144c0 17.67 14.33 32 32 32h32c17.67 0 32-14.33 32-32V304h144c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-20812\" class=\"elementor-element elementor-element-e63bdd27 e-con-full e-flex e-con e-child\" data-id=\"e63bdd27\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-da769f02 elementor-widget elementor-widget-heading\" data-id=\"da769f02\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Rassemblez le programme de charge de l'h\u00f4pital, la documentation relative \u00e0 l'onduleur solaire, le sch\u00e9ma unifilaire existant et les obligations en mati\u00e8re de continuit\u00e9 requises, puis demandez une expertise technique sp\u00e9cifique au mod\u00e8le.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-20813\" class=\"e-n-accordion-item\">\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"14\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-20813\">\n\t\t\t\t\t<span class=\"e-n-accordion-item-title-header\"><div class=\"e-n-accordion-item-title-text\"> Ces recommandations s'appliquent-elles aux h\u00f4pitaux nig\u00e9rians ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class=\"e-n-accordion-item-title-icon\">\n\t\t\t<span class=\"e-opened\"><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-minus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h384c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t\t<span class=\"e-closed\"><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-plus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H272V64c0-17.67-14.33-32-32-32h-32c-17.67 0-32 14.33-32 32v144H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h144v144c0 17.67 14.33 32 32 32h32c17.67 0 32-14.33 32-32V304h144c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-20813\" class=\"elementor-element elementor-element-98911436 e-con-full e-flex e-con e-child\" data-id=\"98911436\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-793d7546 elementor-widget elementor-widget-heading\" data-id=\"793d7546\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Oui. Ce document traite d'un cahier des charges relatif \u00e0 un march\u00e9 public dans un h\u00f4pital nig\u00e9rian. Les normes \u00e9lectriques locales, les exigences en mati\u00e8re d'importation, les conditions sur site et les autorisations doivent \u00eatre prises en compte lors de l'examen final du projet.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-20814\" class=\"e-n-accordion-item\">\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"15\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-20814\">\n\t\t\t\t\t<span class=\"e-n-accordion-item-title-header\"><div class=\"e-n-accordion-item-title-text\"> Cette approche pourrait-elle \u00eatre mise en \u0153uvre dans des h\u00f4pitaux d'autres pays africains ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class=\"e-n-accordion-item-title-icon\">\n\t\t\t<span class=\"e-opened\"><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-minus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h384c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t\t<span class=\"e-closed\"><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-plus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H272V64c0-17.67-14.33-32-32-32h-32c-17.67 0-32 14.33-32 32v144H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h144v144c0 17.67 14.33 32 32 32h32c17.67 0 32-14.33 32-32V304h144c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-20814\" class=\"elementor-element elementor-element-46f8e470 e-con-full e-flex e-con e-child\" data-id=\"46f8e470\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-d4772570 elementor-widget elementor-widget-heading\" data-id=\"d4772570\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Oui. La hi\u00e9rarchie des charges, l\u2019examen des interfaces et le processus de d\u00e9ploiement par \u00e9tapes s\u2019appliquent \u00e0 l\u2019ensemble des march\u00e9s, les exigences locales en mati\u00e8re de r\u00e9seau, de conditions climatiques, d\u2019autorisations et de services \u00e9tant d\u00e9finies pour chaque site.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-20815\" class=\"e-n-accordion-item\">\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"16\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-20815\">\n\t\t\t\t\t<span class=\"e-n-accordion-item-title-header\"><div class=\"e-n-accordion-item-title-text\"> Pourquoi l'article s'appuie-t-il sur un cas hospitalier anonyme ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class=\"e-n-accordion-item-title-icon\">\n\t\t\t<span class=\"e-opened\"><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-minus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h384c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t\t<span class=\"e-closed\"><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-plus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H272V64c0-17.67-14.33-32-32-32h-32c-17.67 0-32 14.33-32 32v144H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h144v144c0 17.67 14.33 32 32 32h32c17.67 0 32-14.33 32-32V304h144c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-20815\" class=\"elementor-element elementor-element-817bf22c e-con-full e-flex e-con e-child\" data-id=\"817bf22c\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-60680876 elementor-widget elementor-widget-heading\" data-id=\"60680876\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">The case preserves the customer&#x2019;s procurement context while protecting private project identity and avoiding an unsupported delivery claim.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>","protected":false},"excerpt":{"rendered":"<p>Le guide de KRL Power sur les syst\u00e8mes commerciaux de stockage d'\u00e9nergie aide les \u00e9quipes hospitali\u00e8res nig\u00e9rianes \u00e0 d\u00e9finir une premi\u00e8re phase de 250 kWh, des interfaces photovolta\u00efques et une strat\u00e9gie technique visant \u00e0 atteindre \u00e0 terme une capacit\u00e9 de 1 MW.<\/p>","protected":false},"author":9,"featured_media":12469,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_uag_custom_page_level_css":"","site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"_joinchat":[],"footnotes":""},"categories":[95,82,77],"tags":[912,913,381,911,125,914,910],"class_list":["post-12472","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy-storage","category-industry-application","category-bess","tag-250-kwh-bess","tag-bess-expansion-planning","tag-commercial-energy-storage-system","tag-hospital-battery-storage","tag-krl-power","tag-lifepo4-ess","tag-nigerian-hospital-bess"],"acf":[],"uagb_featured_image_src":{"full":["https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/08\/KRL-B241-Hospital-First-Phase-Planning.jpg",1280,720,false],"thumbnail":["https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/08\/KRL-B241-Hospital-First-Phase-Planning-150x150.jpg",150,150,true],"medium":["https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/08\/KRL-B241-Hospital-First-Phase-Planning-300x169.jpg",300,169,true],"medium_large":["https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/08\/KRL-B241-Hospital-First-Phase-Planning-768x432.jpg",768,432,true],"large":["https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/08\/KRL-B241-Hospital-First-Phase-Planning-1024x576.jpg",1024,576,true],"1536x1536":["https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/08\/KRL-B241-Hospital-First-Phase-Planning.jpg",1280,720,false],"2048x2048":["https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/08\/KRL-B241-Hospital-First-Phase-Planning.jpg",1280,720,false],"trp-custom-language-flag":["https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/08\/KRL-B241-Hospital-First-Phase-Planning.jpg",18,10,false],"woocommerce_thumbnail":["https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/08\/KRL-B241-Hospital-First-Phase-Planning-300x300.jpg",300,300,true],"woocommerce_single":["https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/08\/KRL-B241-Hospital-First-Phase-Planning-600x338.jpg",600,338,true],"woocommerce_gallery_thumbnail":["https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/08\/KRL-B241-Hospital-First-Phase-Planning-100x100.jpg",100,100,true]},"uagb_author_info":{"display_name":"KRL Power_LEI","author_link":"https:\/\/www.krlpower.com\/fr\/author\/krl-power_lei\/"},"uagb_comment_info":0,"uagb_excerpt":"KRL Power&#x2019;s commercial energy storage system guide helps Nigerian hospital teams define a 250 kWh first phase, PV interfaces and an engineered route toward future 1 MW capacity.","_links":{"self":[{"href":"https:\/\/www.krlpower.com\/fr\/wp-json\/wp\/v2\/posts\/12472","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.krlpower.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.krlpower.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.krlpower.com\/fr\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.krlpower.com\/fr\/wp-json\/wp\/v2\/comments?post=12472"}],"version-history":[{"count":1,"href":"https:\/\/www.krlpower.com\/fr\/wp-json\/wp\/v2\/posts\/12472\/revisions"}],"predecessor-version":[{"id":12473,"href":"https:\/\/www.krlpower.com\/fr\/wp-json\/wp\/v2\/posts\/12472\/revisions\/12473"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.krlpower.com\/fr\/wp-json\/wp\/v2\/media\/12469"}],"wp:attachment":[{"href":"https:\/\/www.krlpower.com\/fr\/wp-json\/wp\/v2\/media?parent=12472"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.krlpower.com\/fr\/wp-json\/wp\/v2\/categories?post=12472"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.krlpower.com\/fr\/wp-json\/wp\/v2\/tags?post=12472"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}