{"id":13229,"date":"2026-11-14T07:35:13","date_gmt":"2026-11-14T07:35:13","guid":{"rendered":"https:\/\/www.krlpower.com\/?p=13229"},"modified":"2026-11-14T07:35:13","modified_gmt":"2026-11-14T07:35:13","slug":"airport-gse-lithium-power-systems","status":"publish","type":"post","link":"https:\/\/www.krlpower.com\/ar\/bess\/airport-gse-lithium-power-systems\/","title":{"rendered":"Airport GSE Lithium Power Systems: How to Specify Custom Power Units for Baggage Tractors and Tugs"},"content":{"rendered":"<div data-elementor-type=\"wp-post\" data-elementor-id=\"13229\" class=\"elementor elementor-13229\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-8887f40 auto-article-root e-flex e-con-boxed e-con e-parent\" data-id=\"8887f40\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-28b56a4e auto-p elementor-widget elementor-widget-heading\" data-id=\"28b56a4e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">A baggage tractor clears one stand and receives its next assignment before the driver reaches the service road. On a wet ramp, the next departure still needs full pulling power, a trustworthy state-of-charge reading and a fault code the maintenance team can act on.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-71c33802 auto-p elementor-widget elementor-widget-heading\" data-id=\"71c33802\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">A custom KRL airport GSE lithium power system puts the battery pack, enclosure, BMS, thermal design and communication interface under one engineering scope. Fleet managers can plan vehicle availability with better data, and retrofit teams get a defined path from the vehicle survey to a commissioned pack.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-de92eadd auto-p elementor-widget elementor-widget-heading\" data-id=\"de92eadd\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\"><strong><a href=\"https:\/\/www.iata.org\/en\/programs\/ops-infra\/ground-operations\/ground-support-equipment\/electric-gse\" target=\"_blank\" style=\"color:#046bd2\" rel=\"noopener\">IATA reports<\/a><\/strong> that, in its average-EU-country scenario, electric GSE produce 35% to 52% lower CO2 emissions and up to 5.5 to 8.3 dB(A) lower noise emissions per turnaround than traditional GSE. Its transition guidance covers ramp operations, infrastructure, safety and economics because each one affects fleet deployment.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d440eab6 auto-image elementor-widget elementor-widget-image\" data-id=\"d440eab6\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/11\/airport-gse-lithium-key-points-overview.webp\" class=\"attachment-large size-large wp-image-13226\" alt=\"Infographic summarizing airport GSE lithium battery voltages, cycle life, discharge rates, ramp protection and fleet conversion steps\"\/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-bc446210 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"bc446210\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">What airport GSE demands from a lithium power system<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-4f20cf50 auto-p elementor-widget elementor-widget-heading\" data-id=\"4f20cf50\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Airport GSE combines repeated acceleration, short travel cycles, towing loads, outdoor exposure and narrow charging windows. Engineers must size the system from measured duty-cycle data and then match the enclosure, thermal controls, communication interface and charger to the vehicle.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-8b71dd3b auto-h3 elementor-widget elementor-widget-heading\" data-id=\"8b71dd3b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">The load changes every few minutes<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-61976a98 auto-p elementor-widget elementor-widget-heading\" data-id=\"61976a98\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">A baggage tractor may travel light to a stand, pull several loaded carts, stop at multiple transfer points and return for another assignment. A belt loader adds motor starts and conveyor loads. A cargo loader combines traction with repeated hydraulic lift cycles. Each task creates a different current profile.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-6e461fd9 auto-p elementor-widget elementor-widget-heading\" data-id=\"6e461fd9\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Capacity determines how much energy the vehicle carries. Continuous current, peak current and voltage stability determine whether the pack can supply the required torque without tripping protection or starving the controller. A retrofit team needs both sets of data.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-9204190c auto-h3 elementor-widget elementor-widget-heading\" data-id=\"9204190c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Heat, water and vibration reach the pack<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c2e5bf8d auto-p elementor-widget elementor-widget-heading\" data-id=\"c2e5bf8d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">A GSE pack faces rain, washdown, pavement heat and repeated shock from joints and ramps. A field study at Adelaide Airport <strong><a href=\"https:\/\/www.mdpi.com\/2071-1050\/12\/19\/8123\" target=\"_blank\" style=\"color:#046bd2\" rel=\"noopener\">recorded a peak apron surface temperature of 56.5&#xB0;C<\/a><\/strong>. Cold-weather fleets may need insulation, self-heating and BMS-controlled charging.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-5507fe0b auto-h3 elementor-widget elementor-widget-heading\" data-id=\"5507fe0b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Shift planning leaves little room for a long recovery cycle<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-b6c724a9 auto-p elementor-widget elementor-widget-heading\" data-id=\"b6c724a9\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Traditional flooded lead-acid fleets build their schedules around charging, cooling, battery changes and maintenance. For powered industrial trucks in the United States, <strong><a href=\"https:\/\/www.osha.gov\/etools\/powered-industrial-trucks\/types-fundamentals\/power-sources\/electrical\" target=\"_blank\" style=\"color:#046bd2\" rel=\"noopener\">OSHA's battery-charging guidance<\/a><\/strong> calls for a designated area, hydrogen ventilation, spill-response provisions and worker protection.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-fc7c507a auto-p elementor-widget elementor-widget-heading\" data-id=\"fc7c507a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Lithium supports shorter planned charging windows when the selected cells, BMS and charger share an approved charge profile. KRL publishes a 1 to 2 hour charging range for its AGV battery platform, tied to capacity and charge rate.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-2f9578f2 auto-h3 elementor-widget elementor-widget-heading\" data-id=\"2f9578f2\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Weight remains part of the traction system<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-8adfc729 auto-p elementor-widget elementor-widget-heading\" data-id=\"8adfc729\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Many traction vehicles use battery mass as part of their weight distribution. A lighter lithium pack can free space and reduce vehicle mass, yet a tow tractor still needs the axle loading and tire grip required for its rated drawbar pull. The mechanical design must account for battery position, enclosure mass, mounting loads and any ballast specified by the vehicle engineer.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-b87175e8 auto-p elementor-widget elementor-widget-heading\" data-id=\"b87175e8\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Airport ground support equipment electrification is a vehicle engineering program. Duty-cycle data has to drive the battery, charger and vehicle interfaces.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-2ff5f8cb auto-h2 elementor-widget elementor-widget-heading\" data-id=\"2ff5f8cb\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">What belongs in a complete GSE power-unit specification<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-dcb08cce auto-p elementor-widget elementor-widget-heading\" data-id=\"dcb08cce\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">A complete GSE power-unit specification covers the pack, BMS, enclosure, mounting, connectors, charge interface and vehicle communication. KRL's published AGV program includes custom dimensions and interfaces, BMS protection, fast-charge options, wide-temperature configurations and CAN or RS485 communication.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-6cffde63 auto-h3 elementor-widget elementor-widget-heading\" data-id=\"6cffde63\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">1. Battery modules sized from the duty cycle<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-6d959c6d auto-p elementor-widget elementor-widget-heading\" data-id=\"6d959c6d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">The engineering team starts with nominal voltage, average energy use, continuous current and peak current. KRL's AGV page lists 24V, 36V, 48V and 72V as typical nominal-voltage options, and 20Ah to 200Ah as a typical capacity range, with higher-capacity customization available.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-0c870886 auto-p elementor-widget elementor-widget-heading\" data-id=\"0c870886\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Those catalog ranges provide an RFQ starting point. A heavy tow vehicle may need a non-standard voltage, more capacity or another cell architecture. KRL can review that requirement after the customer supplies controller limits, load data and available battery-bay volume.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-6136898c auto-h3 elementor-widget elementor-widget-heading\" data-id=\"6136898c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">2. BMS protection and usable vehicle data<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-82377440 auto-p elementor-widget elementor-widget-heading\" data-id=\"82377440\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">The published BMS functions include protection against overcharge, over-discharge, overcurrent, short circuit and temperature excursions. KRL also supports custom CAN and RS485 communication. With an application-specific protocol, the BMS can report pack voltage, current, state of charge, cell temperature and protection status to a vehicle controller, display or fleet gateway.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-1c1cd695 auto-p elementor-widget elementor-widget-heading\" data-id=\"1c1cd695\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">The RFQ should include the communication protocol, baud rate, message map, wake and sleep logic, charger handshake and fault-response rules. CAN support alone does not define a J1939 implementation. If the vehicle uses J1939 or a proprietary CAN map, provide the interface control document for review.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-69720d3a auto-h3 elementor-widget elementor-widget-heading\" data-id=\"69720d3a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">3. An enclosure built around the vehicle<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-24d28529 auto-p elementor-widget elementor-widget-heading\" data-id=\"24d28529\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">The enclosure has to fit the battery bay, carry module loads, resist movement and give technicians safe access to service points. KRL states on its robot-battery page that collision-resistant enclosures can be customized up to IP67. A GSE configuration requires project-specific validation.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a218f80d auto-p elementor-widget elementor-widget-heading\" data-id=\"a218f80d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">The drawing package should define mounting-hole locations, lifting points, service clearances, drainage, connector orientation and the center of mass. Define the same seals, connectors and access panels in both the production drawing and IP validation plan.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-f9880474 auto-h3 elementor-widget elementor-widget-heading\" data-id=\"f9880474\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">4. A charge system matched to the site<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c10f3e53 auto-p elementor-widget elementor-widget-heading\" data-id=\"c10f3e53\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">The charger, cell selection, BMS limits and cable path form one electrical design. KRL offers custom chargers and publishes 1 to 2 hour charging for its AGV platform, subject to pack capacity and rate settings.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-1b2ff318 auto-p elementor-widget elementor-widget-heading\" data-id=\"1b2ff318\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Choose the charging architecture during design: fixed off-board charging for a central depot, distributed charging near parking areas or an on-board charger where the AC supply, vehicle space and heat rejection support it.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-fdc4439a auto-h3 elementor-widget elementor-widget-heading\" data-id=\"fdc4439a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">5. Harnesses, connectors and operator information<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-76e12e03 auto-p elementor-widget elementor-widget-heading\" data-id=\"76e12e03\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">High-current cables need the correct conductor size, bend radius, strain relief, fuse coordination and connector current rating. Low-voltage circuits need clean routing for communication, interlocks and sensors. The retrofit team should keep power and signal paths separated and document every mating connector.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-e14eb964 auto-p elementor-widget elementor-widget-heading\" data-id=\"e14eb964\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">The driver also needs usable information. A display may show SOC, pack status and fault codes when the vehicle controller or a dedicated gauge supports the selected BMS messages. A fleet gateway can use the same data for charge planning and maintenance alerts. Put the display and gateway in the system boundary if KRL or the retrofit contractor will supply them.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-2c155090 auto-h3 elementor-widget elementor-widget-heading\" data-id=\"2c155090\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">KRL's published AGV data as an RFQ baseline<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-be31f297 auto-table elementor-widget elementor-widget-text-editor\" data-id=\"be31f297\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<div class=\"cea-table-wrap\"><table><thead><tr><th>\u0627\u0644\u0645\u0639\u0644\u0645\u0629<\/th><th>Published typical\/customizable KRL range<\/th><th>How to use it in a GSE project<\/th><\/tr><\/thead><tbody><tr><td>\u0627\u0644\u062c\u0647\u062f \u0627\u0644\u0627\u0633\u0645\u064a<\/td><td>24V \/ 36V \/ 48V \/ 72V<\/td><td>Match the motor controller and auxiliary loads; request engineering review for other platforms<\/td><\/tr><tr><td>Capacity<\/td><td>20Ah to 200Ah, with higher capacity customization<\/td><td>Size from measured energy use, reserve, temperature and aging allowance<\/td><\/tr><tr><td>\u0639\u0645\u0631 \u0627\u0644\u062f\u0648\u0631\u0629<\/td><td>At least 3,000 cycles at 80% DoD and room temperature<\/td><td>Verify the rating for the selected cell configuration<\/td><\/tr><tr><td>Charging time<\/td><td>1 to 2 hours, depending on capacity and charge rate<\/td><td>Build the shift model from the project charge curve and available supply<\/td><\/tr><tr><td>Discharge rate<\/td><td>1C to 3C, configurable<\/td><td>Check continuous and peak current against traction and hydraulic loads<\/td><\/tr><tr><td>Published operating range<\/td><td>-20&#xB0;C to +60&#xB0;C<\/td><td>Define separate charge, discharge and storage limits for the final design<\/td><\/tr><tr><td>\u062d\u0645\u0627\u064a\u0629 \u0646\u0638\u0627\u0645 \u0625\u062f\u0627\u0631\u0629 \u0627\u0644\u0628\u0637\u0627\u0631\u064a\u0629 (BMS)<\/td><td>Overcharge, over-discharge, overcurrent, short circuit and temperature<\/td><td>Map each protection event to the vehicle response and service procedure<\/td><\/tr><tr><td>\u0627\u0644\u062a\u0648\u0627\u0635\u0644<\/td><td>RS485 and CAN customization; UART on selected packs<\/td><td>Supply the host protocol and message requirements during design<\/td><\/tr><tr><td>Environmental options<\/td><td>Self-heating and enclosure sealing up to IP67 on suitable custom projects<\/td><td>List the required heating and IP target in the RFQ<\/td><\/tr><\/tbody><\/table><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-dc573eea auto-image elementor-widget elementor-widget-image\" data-id=\"dc573eea\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/11\/krl-agv-data-gse-rfq-baseline.webp\" class=\"attachment-large size-large wp-image-13227\" alt=\"KRL AGV lithium battery baseline for an airport GSE RFQ, showing 24&#x2013;72 V, 3,000-plus cycles, 1&#x2013;2 hour charging and 1C&#x2013;3C discharge\"\/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-de043b43 auto-p elementor-widget elementor-widget-heading\" data-id=\"de043b43\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Source: <strong><a href=\"https:\/\/www.krlpower.com\/ar\/agv\/\" target=\"_blank\" style=\"color:#046bd2\">KRL AGV lithium battery specifications and customization options<\/a><\/strong> \u0648 <strong><a href=\"https:\/\/www.krlpower.com\/ar\/%d8%ad%d9%84%d9%88%d9%84-%d8%a8%d8%b7%d8%a7%d8%b1%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%b1%d9%88%d8%a8%d9%88%d8%aa%d8%a7%d8%aa\/\" target=\"_blank\" style=\"color:#046bd2\">KRL robot battery solutions<\/a><\/strong>.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-843e30f3 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"843e30f3\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Matching the power system to the GSE vehicle<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-dc0f3b39 auto-p elementor-widget elementor-widget-heading\" data-id=\"dc0f3b39\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Logged current, route, payload, shift duration and charging windows determine the final configuration. Two tractors with the same nominal voltage can need different batteries when one makes short baggage runs and the other pulls cargo dollies across a large hub.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-3979701e auto-h3 elementor-widget elementor-widget-heading\" data-id=\"3979701e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Baggage tow tractors<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-e4d7c117 auto-p elementor-widget elementor-widget-heading\" data-id=\"e4d7c117\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">An electric baggage tractor power unit must support repeated starts under drawbar load, predictable SOC reporting and enough usable energy for the assigned shift. The design review should capture the number of carts, route grade, travel distance, idle time and seasonal temperature.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-86b55d99 auto-p elementor-widget elementor-widget-heading\" data-id=\"86b55d99\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">The battery bay sets the mechanical limits. Record its length, width and height, then add the hold-down features, connector location and original battery mass. The vehicle manufacturer or responsible engineer should confirm the required weight distribution and tow rating after conversion.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-540c6615 auto-h3 elementor-widget elementor-widget-heading\" data-id=\"540c6615\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Belt loaders and cargo loaders<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-3e0374e9 auto-p elementor-widget elementor-widget-heading\" data-id=\"3e0374e9\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">A belt loader combines traction and conveyor demand. A cargo loader adds hydraulic pumps, repeated lift cycles and auxiliary control loads. Average energy alone can hide the current spike that occurs when the lift starts under payload.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-fa1d0bb3 auto-p elementor-widget elementor-widget-heading\" data-id=\"fa1d0bb3\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Use logged continuous and peak current to select the cells, busbars, contactors and BMS current rating. Match the selected discharge rating to the duration and frequency of the logged traction and hydraulic peaks.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-7feddb9d auto-h3 elementor-widget elementor-widget-heading\" data-id=\"7feddb9d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Aircraft tugs and pushback tractors<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-09f71000 auto-p elementor-widget elementor-widget-heading\" data-id=\"09f71000\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Treat a pushback tractor as a separate powertrain class. Aircraft mass, towbar or towbarless architecture, duty cycle, braking system and safety functions shape the complete power profile.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-77b58c2d auto-p elementor-widget elementor-widget-heading\" data-id=\"77b58c2d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">An aircraft tug lithium battery pack often calls for higher voltage, more stored energy and stronger thermal control than the published AGV range. KRL begins its feasibility review with the full traction profile, braking architecture and vehicle safety requirements.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-84051ee8 auto-table elementor-widget elementor-widget-text-editor\" data-id=\"84051ee8\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<div class=\"cea-table-wrap\"><table><thead><tr><th>GSE type<\/th><th>Data that drives sizing<\/th><th>Main integration focus<\/th><\/tr><\/thead><tbody><tr><td>Baggage tow tractor<\/td><td>Cart count, drawbar load, route, shift hours, charge windows<\/td><td>Battery mass, axle loading, controller interface and SOC visibility<\/td><\/tr><tr><td>Belt loader<\/td><td>Drive cycle, conveyor current, working height and idle time<\/td><td>Combined traction and conveyor peaks, cable routing and weather sealing<\/td><\/tr><tr><td>Cargo loader<\/td><td>Lift cycles, payload, hydraulic pump current and dwell time<\/td><td>Peak current duration, thermal control and stable voltage under lift load<\/td><\/tr><tr><td>Aircraft tug<\/td><td>Aircraft class, tow force, speed profile, grade and braking architecture<\/td><td>High-power validation, system safety, cooling and vehicle-level approval<\/td><\/tr><\/tbody><\/table><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-6538d69a auto-p elementor-widget elementor-widget-heading\" data-id=\"6538d69a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">KRL can use these inputs to evaluate a <strong><a href=\"https:\/\/www.krlpower.com\/ar\/agv\/\" target=\"_blank\" style=\"color:#046bd2\">custom battery pack and BMS configuration for mobile industrial equipment<\/a><\/strong>, including non-standard dimensions, interfaces and communication options.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-7e23b0a8 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"7e23b0a8\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Engineering for heat, cold, water and ramp vibration<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c933e193 auto-p elementor-widget elementor-widget-heading\" data-id=\"c933e193\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Write the environmental limits as testable requirements before the team freezes the enclosure and connector design. Those requirements should cover temperature, ingress protection, vibration, mechanical loads, chemical exposure and the washdown method.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-37afe716 auto-h3 elementor-widget elementor-widget-heading\" data-id=\"37afe716\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Set separate thermal limits for charging and discharge<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-418c70bb auto-p elementor-widget elementor-widget-heading\" data-id=\"418c70bb\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">KRL publishes a -20&#xB0;C to +60&#xB0;C operating range for its AGV platform and offers self-heating configurations for cold applications. The final data sheet should separate charging, discharging and storage limits. Those limits can differ, and the BMS must enforce the selected cell manufacturer's charge rules.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-8fb45032 auto-p elementor-widget elementor-widget-heading\" data-id=\"8fb45032\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">For a cold-weather fleet, define the lowest soak temperature, available preheat time and energy source for heating. A self-heating design can raise cell temperature before high-current charging. For a hot-weather fleet, define solar exposure, pavement temperature, duty cycle and parking conditions so the engineer can size heat paths and protection thresholds.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-44dc648b auto-h3 elementor-widget elementor-widget-heading\" data-id=\"44dc648b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Seal the enclosure without trapping heat or pressure<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-25510737 auto-p elementor-widget elementor-widget-heading\" data-id=\"25510737\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Ingress protection depends on the complete enclosure. Cable glands, connector seals, service covers, pressure equalization and fastener torque all affect the result. KRL states that custom heavy-duty robot packs can use enclosures up to IP67. A GSE project should request an IP target and test evidence for its exact build.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-7243ff6e auto-p elementor-widget elementor-widget-heading\" data-id=\"7243ff6e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">The battery bay also needs a service plan. Technicians must reach fuses, disconnects and diagnostic ports without disturbing sealed joints that the maintenance procedure does not ask them to open.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-b362a55a auto-h3 elementor-widget elementor-widget-heading\" data-id=\"b362a55a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Validate mounts against the actual route<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-8573f59b auto-p elementor-widget elementor-widget-heading\" data-id=\"8573f59b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Repeated low-level vibration and occasional shocks load the modules, busbars, connectors and enclosure mounts in different ways. Specify the vehicle's mounting orientation and route conditions. KRL's testing page lists vibration and compression evaluation, drop testing, thermal cycling, humidity exposure and IP\/immersion testing among its in-house capabilities. Confirm which tests, standards and equipment apply to the proposed GSE pack. The validation plan should state the test standard, axis, level, duration and pass criteria for the GSE configuration.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-9e00e44f auto-h3 elementor-widget elementor-widget-heading\" data-id=\"9e00e44f\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Design interfaces that prevent connection errors<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c8f9ba6a auto-p elementor-widget elementor-widget-heading\" data-id=\"c8f9ba6a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Keyed connectors, clear labels, protected terminals and defined cable support reduce installation and service errors. The high-voltage or high-current path needs a service disconnect and coordinated protection. The low-voltage side needs stable power, wake logic and an agreed response to lost communication.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-4924e9c7 auto-p elementor-widget elementor-widget-heading\" data-id=\"4924e9c7\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">These interfaces, control rules and mounting details give installers a reproducible GSE powertrain retrofit kit. KRL evaluates the pack and BMS. The integration plan covers vehicle-side wiring, controls, display and charger.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-fe872474 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"fe872474\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Lead-acid replacement, separate components or a custom assembly?<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-af0b7ae6 auto-p elementor-widget elementor-widget-heading\" data-id=\"af0b7ae6\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Lead-acid replacement preserves the current architecture. Teams with their own integration resources may prefer separate components. A KRL custom battery assembly puts the pack, enclosure, BMS and interfaces in one engineering scope, which reduces handoffs before the first vehicle reaches the workshop.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-cf9e4e2e auto-table elementor-widget elementor-widget-text-editor\" data-id=\"cf9e4e2e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<div class=\"cea-table-wrap\"><table><thead><tr><th>Decision factor<\/th><th>Lead-acid replacement<\/th><th>Separate-component lithium retrofit<\/th><th>KRL custom-engineered battery assembly<\/th><\/tr><\/thead><tbody><tr><td>Supply scope<\/td><td>Battery and existing charging workflow<\/td><td>Battery plus components selected by the integrator<\/td><td>Custom pack, BMS, enclosure and project-matched interfaces; charger options available<\/td><\/tr><tr><td>Mechanical fit<\/td><td>Uses the original tray format<\/td><td>Integrator adapts pack and mounting<\/td><td>KRL designs pack dimensions and interfaces from vehicle drawings<\/td><\/tr><tr><td>Charging<\/td><td>Existing lead-acid charger and service process<\/td><td>Integrator selects and validates charger<\/td><td>Charge rate and charger can be matched to the project<\/td><\/tr><tr><td>Vehicle data<\/td><td>Limited or added through separate devices<\/td><td>Integrator maps BMS and display<\/td><td>CAN or RS485 can be customized from an agreed protocol<\/td><\/tr><tr><td>Temperature strategy<\/td><td>Battery-specific maintenance and derating<\/td><td>Depends on selected pack<\/td><td>Wide-temperature and self-heating options can enter the custom design<\/td><\/tr><tr><td>Validation ownership<\/td><td>Fleet follows original equipment process<\/td><td>Integrator coordinates several suppliers<\/td><td>The project contract assigns pack tests and interface acceptance criteria among KRL, the customer and the vehicle integrator<\/td><\/tr><tr><td>\u0627\u0644\u062d\u0627\u0644\u0629 \u0627\u0644\u0623\u0646\u0633\u0628<\/td><td>Fleets retaining the original architecture<\/td><td>Teams with vehicle integration resources<\/td><td>OEMs and contractors that want one battery engineering partner<\/td><\/tr><\/tbody><\/table><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-02e6505b auto-h2 elementor-widget elementor-widget-heading\" data-id=\"02e6505b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">From vehicle survey to a commissioned conversion<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-30757b9a auto-p elementor-widget elementor-widget-heading\" data-id=\"30757b9a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">A lead-acid-to-lithium baggage tractor conversion needs field data before pack design and a controlled pilot before fleet rollout. Engineers can shorten the installation window by resolving the fit, connectors, software and commissioning checks before the pack reaches the vehicle.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-19f66fa9 auto-image elementor-widget elementor-widget-image\" data-id=\"19f66fa9\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/11\/gse-conversion-six-steps-survey-to-pilot.webp\" class=\"attachment-large size-large wp-image-13228\" alt=\"Six-step workflow for converting airport GSE from duty-cycle survey to a commissioned lithium battery pilot\"\/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-8b3983c1 auto-h3 elementor-widget elementor-widget-heading\" data-id=\"8b3983c1\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Step 1: Record the duty cycle<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-2e2a3a77 auto-p elementor-widget elementor-widget-heading\" data-id=\"2e2a3a77\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Log current, voltage and operating time across representative shifts. Mark towing, acceleration, grade, idle and auxiliary-load periods. Record the lowest return SOC and the time available for charging. Include hot and cold seasons when the fleet operates across a wide climate range.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-efb85192 auto-h3 elementor-widget elementor-widget-heading\" data-id=\"efb85192\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Step 2: Capture the mechanical envelope<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c73efdbd auto-p elementor-widget elementor-widget-heading\" data-id=\"c73efdbd\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Provide a dimensioned battery-bay drawing, photographs, mounting details, lid clearance, cable exits and lifting restrictions. Record the original battery weight and center-of-mass location. Identify corrosion, damaged mounts or vehicle-to-vehicle variation before production begins.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-3844f22d auto-h3 elementor-widget elementor-widget-heading\" data-id=\"3844f22d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Step 3: Freeze the electrical interfaces<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a37bc3b0 auto-p elementor-widget elementor-widget-heading\" data-id=\"a37bc3b0\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Confirm nominal voltage, controller voltage limits, continuous current, peak current and auxiliary supplies. List connector part numbers, polarity, pre-charge needs, contactor logic, key switch behavior and emergency disconnect requirements.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-894894e6 auto-h3 elementor-widget elementor-widget-heading\" data-id=\"894894e6\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Step 4: Define charging around the operation<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-0df5b0d2 auto-p elementor-widget elementor-widget-heading\" data-id=\"0df5b0d2\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Map parking locations, available AC supply, shift gaps and the number of vehicles that may charge at once. Size each window from logged energy use, required departure SOC and the approved charge curve.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-ba8982e9 auto-p elementor-widget elementor-widget-heading\" data-id=\"ba8982e9\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Required nominal energy = measured shift energy \/ target usable fraction + operating reserve<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c813be5c auto-p elementor-widget elementor-widget-heading\" data-id=\"c813be5c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">KRL's published 1 to 2 hour charge range provides an RFQ baseline; the production schedule follows the selected pack and charger. Confirm distribution capacity, protection, connector placement and emergency procedures before fleet rollout. IATA identifies infrastructure, ramp operations, safety and economics as connected parts of the eGSE transition.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-e35b889d auto-h3 elementor-widget elementor-widget-heading\" data-id=\"e35b889d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Step 5: Build and validate the prototype<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a7a0952b auto-p elementor-widget elementor-widget-heading\" data-id=\"a7a0952b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">KRL quotes 6 to 12 weeks for a typical prototype stage before certification work and volume production. The full schedule also covers design approval, component lead time, vehicle integration and validation.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-ec492245 auto-p elementor-widget elementor-widget-heading\" data-id=\"ec492245\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Factory tests should cover electrical performance, BMS protection, communication, insulation, thermal behavior and the agreed environmental profile. Vehicle tests should cover traction, braking interaction, loaded route performance, SOC accuracy, charging and fault handling.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-0c77876b auto-h3 elementor-widget elementor-widget-heading\" data-id=\"0c77876b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Step 6: Pilot one vehicle before fleet rollout<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-86bd01e6 auto-p elementor-widget elementor-widget-heading\" data-id=\"86bd01e6\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Run the first vehicle on representative assignments. Track energy per shift, peak current, temperature, charge time, fault events and driver feedback. Freeze the installation instructions after the pilot meets its acceptance criteria, then repeat the approved process across the fleet.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-74067491 auto-h3 elementor-widget elementor-widget-heading\" data-id=\"74067491\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Information KRL needs for an engineering review<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-5be501cb auto-table elementor-widget elementor-widget-text-editor\" data-id=\"5be501cb\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<div class=\"cea-table-wrap\"><table><thead><tr><th>\u0627\u0644\u0625\u062f\u062e\u0627\u0644<\/th><th>What to provide<\/th><\/tr><\/thead><tbody><tr><td>Vehicle<\/td><td>Manufacturer, model, year, equipment type and quantity<\/td><\/tr><tr><td>Existing battery<\/td><td>Chemistry, nominal voltage, rated capacity, mass and charger<\/td><\/tr><tr><td>Battery bay<\/td><td>L x W x H drawing, mounting points, clearances and connector position<\/td><\/tr><tr><td>Electrical load<\/td><td>Continuous current, peak current, peak duration and controller limits<\/td><\/tr><tr><td>\u0627\u0644\u062a\u0634\u063a\u064a\u0644<\/td><td>Payload, route, shift hours, idle time and seasonal conditions<\/td><\/tr><tr><td>Charging<\/td><td>Available supply, parking location, charge windows and simultaneous vehicles<\/td><\/tr><tr><td>\u0627\u0644\u062a\u0648\u0627\u0635\u0644<\/td><td>CAN, RS485, UART or proprietary protocol documents<\/td><\/tr><tr><td>Environment<\/td><td>Minimum and maximum temperature, rain, washdown, dust and chemical exposure<\/td><\/tr><tr><td>Compliance<\/td><td>Destination market, transport route, applicable vehicle rules and requested standards<\/td><\/tr><\/tbody><\/table><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-ac9c3b51 auto-p elementor-widget elementor-widget-heading\" data-id=\"ac9c3b51\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Send KRL the vehicle data above for a custom battery and interface review.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-76fcefaf auto-h2 elementor-widget elementor-widget-heading\" data-id=\"76fcefaf\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Match certificates to the delivered configuration<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-65ccbab5 auto-p elementor-widget elementor-widget-heading\" data-id=\"65ccbab5\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">An airport project has separate requirements for transport, battery safety, EMC, vehicle integration and operation. Keep the approved drawing, data sheet, BMS specification, UN 38.3 test summary and agreed validation reports with the delivered pack.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-16298d5a auto-p elementor-widget elementor-widget-heading\" data-id=\"16298d5a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\"><strong><a href=\"https:\/\/unece.org\/transport\/dangerous-goods\/rev8-files\" target=\"_blank\" style=\"color:#046bd2\" rel=\"noopener\">UN 38.3<\/a><\/strong> covers transport testing for the cell or battery type being shipped. <strong><a href=\"https:\/\/webstore.iec.ch\/en\/publication\/64073\" target=\"_blank\" style=\"color:#046bd2\" rel=\"noopener\">IEC 62619:2022<\/a><\/strong> addresses industrial lithium battery safety for non-road motive applications such as forklifts and AGVs. <strong><a href=\"https:\/\/www.ul.com\/insights\/what-ul-2580-understanding-ev-battery-safety-requirements\" target=\"_blank\" style=\"color:#046bd2\" rel=\"noopener\">UL 2580<\/a><\/strong> includes GSE in its scope, while CE marking follows the EU legislation applicable to the finished product.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-36ecfc51 auto-p elementor-widget elementor-widget-heading\" data-id=\"36ecfc51\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">KRL's AGV page lists UL, CE, UN 38.3 and IEC among its certification standards. Name the exact standard and evidence required for the ordered configuration in the RFQ.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-f53f230e auto-p elementor-widget elementor-widget-heading\" data-id=\"f53f230e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\"><strong><a href=\"https:\/\/eur-lex.europa.eu\/EN\/legal-content\/summary\/ground-handling-at-eu-airports.html?fromSummary=32\" target=\"_blank\" style=\"color:#046bd2\" rel=\"noopener\">EASA's adopted ground-handling framework<\/a><\/strong>, scheduled to apply from 27 March 2028, will require operators to keep GSE serviceable, use it within its design parameters, inspect it before first use or seasonal operation and maintain it under a defined program. Add the supplier's installation, inspection, storage and maintenance instructions to that program.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a52281ca auto-h2 elementor-widget elementor-widget-heading\" data-id=\"a52281ca\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Building the business case for GSE electrification<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-318c5afe auto-p elementor-widget elementor-widget-heading\" data-id=\"318c5afe\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Build the business case from fleet records. Count the costs and operating constraints the conversion can change, then compare them with the installed system cost and infrastructure plan.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-94e415d3 auto-p elementor-widget elementor-widget-heading\" data-id=\"94e415d3\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">IATA's CO2 and noise figures help frame the environmental case. The operating case comes from local data:<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-dff77c78 auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"dff77c78\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Fuel or electricity consumed by each vehicle class<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Lead-acid watering, equalization, battery-change and room-maintenance labor<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Diesel engine, transmission, exhaust and fluid service<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Charger losses, demand charges and infrastructure work<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Spare batteries and backup vehicles tied to the current schedule<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Unplanned downtime, roadside recovery and delayed assignment records<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Pack, charger, installation, training and financing cost<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-389cfaf1 auto-p elementor-widget elementor-widget-heading\" data-id=\"389cfaf1\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Use this equation:<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-bcc1bfcf auto-p elementor-widget elementor-widget-heading\" data-id=\"bcc1bfcf\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Annual operating benefit = avoided fuel and maintenance cost + reduced battery-service labor + recovered vehicle availability - electricity and financing cost<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-8b1bf4d2 auto-p elementor-widget elementor-widget-heading\" data-id=\"8b1bf4d2\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Run sensitivity cases for operating hours, electricity price, battery life, maintenance cost and utilization. Present environmental targets beside the measured operating case.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-4fe9b905 auto-p elementor-widget elementor-widget-heading\" data-id=\"4fe9b905\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">KRL rates its published AGV platform for at least 3,000 cycles at 80% DoD and room temperature. Use the selected pack's rated cycle life in the model, then test temperature, DoD, charge rate and calendar aging as sensitivity factors.<\/p>\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-edd6bdb7 e-con-full auto-faq e-flex e-con e-child\" data-id=\"edd6bdb7\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-4aeb0087 elementor-widget elementor-widget-heading\" data-id=\"4aeb0087\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">\u0627\u0644\u0623\u0633\u0626\u0644\u0629 \u0627\u0644\u0634\u0627\u0626\u0639\u0629<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-ea6fc88f elementor-widget elementor-widget-n-accordion\" data-id=\"ea6fc88f\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings='{\"default_state\":\"all_collapsed\",\"max_items_expended\":\"one\",\"n_accordion_animation_duration\":{\"unit\":\"ms\",\"size\":400,\"sizes\":[]}}' data-widget_type=\"nested-accordion.default\">\n\t\t\t\t\t\t\t<div class=\"e-n-accordion\" aria-label=\"\u0627\u0644\u0623\u0643\u0648\u0631\u062f\u064a\u0648\u0646. \u0627\u0641\u062a\u062d \u0627\u0644\u0631\u0648\u0627\u0628\u0637 \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0645\u0641\u062a\u0627\u062d \u00abEnter\u00bb \u0623\u0648 \u0645\u0641\u062a\u0627\u062d \u0627\u0644\u0645\u0633\u0627\u0641\u0629\u060c \u0648\u0623\u063a\u0644\u0642\u0647\u0627 \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0645\u0641\u062a\u0627\u062d \u00abEscape\u00bb\u060c \u0648\u062a\u0646\u0642\u0644 \u0628\u064a\u0646\u0647\u0627 \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0645\u0641\u0627\u062a\u064a\u062d \u0627\u0644\u0623\u0633\u0647\u0645\">\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-3930\" class=\"e-n-accordion-item\">\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"1\" tabindex=\"0\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-3930\">\n\t\t\t\t\t<span class=\"e-n-accordion-item-title-header\"><div class=\"e-n-accordion-item-title-text\"> Can a GSE fleet use opportunity charging? <\/div><\/span>\n\t\t\t\t\t\t\t<span class=\"e-n-accordion-item-title-icon\">\n\t\t\t<span class=\"e-opened\"><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-minus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h384c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t\t<span class=\"e-closed\"><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-plus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H272V64c0-17.67-14.33-32-32-32h-32c-17.67 0-32 14.33-32 32v144H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h144v144c0 17.67 14.33 32 32 32h32c17.67 0 32-14.33 32-32V304h144c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-3930\" class=\"elementor-element elementor-element-cde53f48 e-con-full e-flex e-con e-child\" data-id=\"cde53f48\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-a260d353 elementor-widget elementor-widget-heading\" data-id=\"a260d353\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<span class=\"elementor-heading-title elementor-size-default\">Opportunity charging is feasible when the approved charge curve and available electrical supply can replace the energy used between assignments. Map that energy against each parking window and keep enough SOC for the next assignment.<\/span>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-3931\" class=\"e-n-accordion-item\">\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"2\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-3931\">\n\t\t\t\t\t<span class=\"e-n-accordion-item-title-header\"><div class=\"e-n-accordion-item-title-text\"> Can KRL support cold-weather airport operation? <\/div><\/span>\n\t\t\t\t\t\t\t<span class=\"e-n-accordion-item-title-icon\">\n\t\t\t<span class=\"e-opened\"><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-minus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h384c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t\t<span class=\"e-closed\"><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-plus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H272V64c0-17.67-14.33-32-32-32h-32c-17.67 0-32 14.33-32 32v144H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h144v144c0 17.67 14.33 32 32 32h32c17.67 0 32-14.33 32-32V304h144c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-3931\" class=\"elementor-element elementor-element-3decad6a e-con-full e-flex e-con e-child\" data-id=\"3decad6a\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-44cea466 elementor-widget elementor-widget-heading\" data-id=\"44cea466\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<span class=\"elementor-heading-title elementor-size-default\">The published AGV operating range is -20&#xB0;C to +60&#xB0;C, and KRL offers self-heating configurations. Share the minimum soak temperature, charging temperature, preheat time and required output so KRL can review the cell, enclosure, heating and BMS configuration and confirm the available test scope.<\/span>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-3932\" class=\"e-n-accordion-item\">\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"3\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-3932\">\n\t\t\t\t\t<span class=\"e-n-accordion-item-title-header\"><div class=\"e-n-accordion-item-title-text\"> Does KRL support CAN 2.0B or J1939? <\/div><\/span>\n\t\t\t\t\t\t\t<span class=\"e-n-accordion-item-title-icon\">\n\t\t\t<span class=\"e-opened\"><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-minus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h384c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t\t<span class=\"e-closed\"><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-plus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H272V64c0-17.67-14.33-32-32-32h-32c-17.67 0-32 14.33-32 32v144H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h144v144c0 17.67 14.33 32 32 32h32c17.67 0 32-14.33 32-32V304h144c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-3932\" class=\"elementor-element elementor-element-9c86d1ec e-con-full e-flex e-con e-child\" data-id=\"9c86d1ec\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-4d7833fd elementor-widget elementor-widget-heading\" data-id=\"4d7833fd\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<span class=\"elementor-heading-title elementor-size-default\">KRL supports customized CAN and RS485 communication. For CAN 2.0B or J1939, send the interface document, baud rate, required messages and charger protocol so KRL can confirm the implementation.<\/span>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-3933\" class=\"e-n-accordion-item\">\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"4\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-3933\">\n\t\t\t\t\t<span class=\"e-n-accordion-item-title-header\"><div class=\"e-n-accordion-item-title-text\"> Can the system include an on-board charger and dashboard display? <\/div><\/span>\n\t\t\t\t\t\t\t<span class=\"e-n-accordion-item-title-icon\">\n\t\t\t<span class=\"e-opened\"><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-minus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h384c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t\t<span class=\"e-closed\"><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-plus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H272V64c0-17.67-14.33-32-32-32h-32c-17.67 0-32 14.33-32 32v144H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h144v144c0 17.67 14.33 32 32 32h32c17.67 0 32-14.33 32-32V304h144c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-3933\" class=\"elementor-element elementor-element-cc2209cd e-con-full e-flex e-con e-child\" data-id=\"cc2209cd\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-fe1b04bc elementor-widget elementor-widget-heading\" data-id=\"fe1b04bc\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<span class=\"elementor-heading-title elementor-size-default\">KRL publishes custom charger and application-specific BMS communication capabilities. Put the OBC, vehicle harness and display in the RFQ so KRL and the retrofit contractor can confirm packaging, cooling, connectors, messages and the supply boundary before design approval.<\/span>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-3934\" class=\"e-n-accordion-item\">\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"5\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-3934\">\n\t\t\t\t\t<span class=\"e-n-accordion-item-title-header\"><div class=\"e-n-accordion-item-title-text\"> Which certifications apply to a GSE lithium conversion? <\/div><\/span>\n\t\t\t\t\t\t\t<span class=\"e-n-accordion-item-title-icon\">\n\t\t\t<span class=\"e-opened\"><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-minus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h384c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t\t<span class=\"e-closed\"><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-plus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H272V64c0-17.67-14.33-32-32-32h-32c-17.67 0-32 14.33-32 32v144H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h144v144c0 17.67 14.33 32 32 32h32c17.67 0 32-14.33 32-32V304h144c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-3934\" class=\"elementor-element elementor-element-264f9911 e-con-full e-flex e-con e-child\" data-id=\"264f9911\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-36f5d636 elementor-widget elementor-widget-heading\" data-id=\"36f5d636\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<span class=\"elementor-heading-title elementor-size-default\">The battery, transport route, vehicle category, destination market and airport operator determine the compliance plan. UN 38.3 covers transport testing. IEC 62619 may apply to an industrial traction battery. UL 2580 includes GSE in its scope, and CE marking follows the EU legislation for the finished product. Request evidence for the ordered configuration.<\/span>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-7e986754 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"7e986754\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Start with the vehicle, shift and battery compartment<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-9cc840f4 auto-p elementor-widget elementor-widget-heading\" data-id=\"9cc840f4\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Send KRL your vehicle model, battery-bay drawing, voltage and current data, shift profile, charging supply and communication protocol. Its engineers will use those inputs to develop the pack architecture, capacity, enclosure, BMS, thermal options and charger proposal for your airport GSE lithium power system.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-258c20b5 auto-p elementor-widget elementor-widget-heading\" data-id=\"258c20b5\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Explore KRL's <strong><a href=\"https:\/\/www.krlpower.com\/ar\/agv\/\" target=\"_blank\" style=\"color:#046bd2\">custom AGV and industrial vehicle lithium battery systems<\/a><\/strong> \u0623\u0648 <strong><a href=\"https:\/\/www.krlpower.com\/ar\/contact-us\/\" target=\"_blank\" style=\"color:#046bd2\">request a GSE engineering review<\/a><\/strong>. The contact page lists a 24-hour expert response.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c3ef50d0 elementor-align-center auto-cta elementor-widget elementor-widget-button\" data-id=\"c3ef50d0\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"button.default\">\n\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm\" href=\"#elementor-action%3Aaction%3Dpopup%3Aopen%26settings%3DeyJpZCI6Ijc5MSIsInRvZ2dsZSI6ZmFsc2V9\" target=\"_blank\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">Request a GSE Engineering Review<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-aea19f61 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"aea19f61\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Technical sources<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-4ffeb178 auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"4ffeb178\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong><a href=\"https:\/\/www.krlpower.com\/ar\/agv\/\" target=\"_blank\" style=\"color:#046bd2\">KRL AGV Battery Solutions<\/a><\/strong><\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong><a href=\"https:\/\/www.krlpower.com\/ar\/%d8%ad%d9%84%d9%88%d9%84-%d8%a8%d8%b7%d8%a7%d8%b1%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%b1%d9%88%d8%a8%d9%88%d8%aa%d8%a7%d8%aa\/\" target=\"_blank\" style=\"color:#046bd2\">KRL Robot Battery Solutions<\/a><\/strong><\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong><a href=\"https:\/\/www.krlpower.com\/ar\/about-us\/\" target=\"_blank\" style=\"color:#046bd2\">KRL Power company and engineering capabilities<\/a><\/strong><\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong><a href=\"https:\/\/www.krlpower.com\/ar\/testing-and-certification\/\" target=\"_blank\" style=\"color:#046bd2\">KRL testing and certification capabilities<\/a><\/strong><\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong><a href=\"https:\/\/www.iata.org\/en\/programs\/ops-infra\/ground-operations\/ground-support-equipment\/electric-gse\" target=\"_blank\" style=\"color:#046bd2\" rel=\"noopener\">IATA Electric GSE guidance and impact data<\/a><\/strong><\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong><a href=\"https:\/\/www.osha.gov\/etools\/powered-industrial-trucks\/types-fundamentals\/power-sources\/electrical\" target=\"_blank\" style=\"color:#046bd2\" rel=\"noopener\">OSHA industrial battery charging guidance<\/a><\/strong><\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong><a href=\"https:\/\/eur-lex.europa.eu\/EN\/legal-content\/summary\/ground-handling-at-eu-airports.html?fromSummary=32\" target=\"_blank\" style=\"color:#046bd2\" rel=\"noopener\">EU ground-handling framework and application date<\/a><\/strong><\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong><a href=\"https:\/\/webstore.iec.ch\/en\/publication\/64073\" target=\"_blank\" style=\"color:#046bd2\" rel=\"noopener\">IEC 62619:2022 scope<\/a><\/strong><\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong><a href=\"https:\/\/www.ul.com\/insights\/what-ul-2580-understanding-ev-battery-safety-requirements\" target=\"_blank\" style=\"color:#046bd2\" rel=\"noopener\">UL 2580 overview<\/a><\/strong><\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong><a href=\"https:\/\/unece.org\/transport\/dangerous-goods\/rev8-files\" target=\"_blank\" style=\"color:#046bd2\" rel=\"noopener\">UN Manual of Tests and Criteria<\/a><\/strong><\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>","protected":false},"excerpt":{"rendered":"<p>KRL engineers custom lithium battery systems around the vehicle&#x2019;s duty cycle, battery bay and charging window. This guide explains the data needed for a GSE conversion.<\/p>","protected":false},"author":9,"featured_media":13225,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_uag_custom_page_level_css":"","site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"_joinchat":[],"footnotes":""},"categories":[77,95,82],"tags":[1199,1197,1195,1196,1200,125,1198],"class_list":["post-13229","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-bess","category-energy-storage","category-industry-application","tag-aircraft-tug-lithium-battery-pack","tag-airport-ground-support-equipment-electrification","tag-airport-gse-lithium-power-system","tag-electric-baggage-tractor-power-unit","tag-gse-powertrain-retrofit-kit","tag-krl-power","tag-lead-acid-to-lithium-baggage-tractor-conversion"],"acf":[],"uagb_featured_image_src":{"full":["https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/11\/airport-gse-lithium-power-systems-cover.webp",1600,1600,false],"thumbnail":["https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/11\/airport-gse-lithium-power-systems-cover.webp",150,150,false],"medium":["https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/11\/airport-gse-lithium-power-systems-cover.webp",300,300,false],"medium_large":["https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/11\/airport-gse-lithium-power-systems-cover.webp",768,768,false],"large":["https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/11\/airport-gse-lithium-power-systems-cover.webp",1024,1024,false],"1536x1536":["https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/11\/airport-gse-lithium-power-systems-cover.webp",1536,1536,false],"2048x2048":["https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/11\/airport-gse-lithium-power-systems-cover.webp",1600,1600,false],"trp-custom-language-flag":["https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/11\/airport-gse-lithium-power-systems-cover.webp",12,12,false],"woocommerce_thumbnail":["https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/11\/airport-gse-lithium-power-systems-cover.webp",300,300,false],"woocommerce_single":["https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/11\/airport-gse-lithium-power-systems-cover.webp",600,600,false],"woocommerce_gallery_thumbnail":["https:\/\/www.krlpower.com\/wp-content\/uploads\/2026\/11\/airport-gse-lithium-power-systems-cover.webp",100,100,false]},"uagb_author_info":{"display_name":"KRL Power_LEI","author_link":"https:\/\/www.krlpower.com\/ar\/author\/krl-power_lei\/"},"uagb_comment_info":0,"uagb_excerpt":"KRL engineers custom lithium battery systems around the vehicle's duty cycle, battery bay and charging window. This guide explains the data needed for a GSE conversion.","_links":{"self":[{"href":"https:\/\/www.krlpower.com\/ar\/wp-json\/wp\/v2\/posts\/13229","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.krlpower.com\/ar\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.krlpower.com\/ar\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.krlpower.com\/ar\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.krlpower.com\/ar\/wp-json\/wp\/v2\/comments?post=13229"}],"version-history":[{"count":6,"href":"https:\/\/www.krlpower.com\/ar\/wp-json\/wp\/v2\/posts\/13229\/revisions"}],"predecessor-version":[{"id":13235,"href":"https:\/\/www.krlpower.com\/ar\/wp-json\/wp\/v2\/posts\/13229\/revisions\/13235"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.krlpower.com\/ar\/wp-json\/wp\/v2\/media\/13225"}],"wp:attachment":[{"href":"https:\/\/www.krlpower.com\/ar\/wp-json\/wp\/v2\/media?parent=13229"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.krlpower.com\/ar\/wp-json\/wp\/v2\/categories?post=13229"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.krlpower.com\/ar\/wp-json\/wp\/v2\/tags?post=13229"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}